WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107

SOL #: 69056726B000006Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

Forks, WA

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 9, 2025
2
Last Updated
Feb 18, 2026
3
Submission Deadline
Mar 25, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Transportation, Federal Highway Administration (FHWA), through its Western Federal Lands Division, has issued an Invitation for Bids (IFB) for Olympic National Park ERFO Repairs 2022 Road 107 (Project Number: WA ERFO NPS OLYM 2022-1 (3)). This project involves critical bank stabilization and environmental engineering repairs to Road 107 within Olympic National Park, Jefferson County, Washington. This is a Total Small Business Set-Aside. Bids are due by March 25, 2026.

Scope of Work

The project focuses on repairs at Mile Posts (MP) 0.3-0.5 and MP 0.8 along Road 107. Key deliverables include:

  • Streambank Stabilization: Installation of riprap (Class 4 and 5), root wads, boulders, engineered log jams (ELJ) with dolosse, log-dolos bundles, and coarse woody debris.
  • Earthwork: Placement of approximately 606 cubic yards of fill at MP 0.3 and 1,037 cubic yards at MP 0.8.
  • Erosion & Sediment Control: Implementation of fiber rolls, rolled erosion control products, and temporary stream diversions.
  • Revegetation: Turf establishment, mulching, and planting of government-furnished species.
  • Traffic Management: Comprehensive temporary traffic control, including signage, flaggers, and lane closures.
  • General Construction: Survey and staking, quality control, sampling and testing, excavation, embankment, and incidental construction. All work must adhere to the "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24" and utilize U.S. Customary units.

Contract Details

  • Contract Type: Firm-Fixed-Price.
  • Estimated Value: Between $700,000 and $2,000,000.
  • Period of Performance: Work to commence within 10 calendar days after Notice to Proceed (NTP assumed by May 22, 2026), with completion not later than August 19, 2026.

Submission & Evaluation

  • Bid Submission: Printed bids are required; electronic bids will not be accepted. Bids must be submitted to the address listed on the SF 1442.
  • Bid Due Date: March 25, 2026, by 4:00 p.m. local time. This date was updated by Amendment A001.
  • Evaluation Criteria: Award will be based on price and other price-related factors. A valid bid bond is required for all submissions.
  • Questions: Pre-bid information and technical questions are accepted up to 5 business days before the bid due date. Questions and answers will be posted on SAM.gov.

Contact Information

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: Feb 18, 2026
Version 2
Solicitation
Posted: Feb 17, 2026
View
Version 1
Pre-Solicitation
Posted: Dec 9, 2025
View