- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The FEDERAL HIGHWAY ADMINISTRATION is issuing a Presolicitation for the WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 project. This effort, located in Jefferson County, Washington State, involves bank stabilization, riprap, and engineered log jam construction on Road 107 within Olympic National Park. The estimated price range is $2,000,000 to $5,000,000, and it is designated as a Total Small Business Set-Aside. The tentative solicitation release is Spring 2026, with a tentative completion by Fall 2026.
Scope of Work
This project focuses on repairing Road 107 (Upper Hoh Road) at specific milepost markers (MP 0.3 to 0.5 and MP 0.8). Key tasks include:
- Bank stabilization using riprap (Class 4 and Class 5) and engineered log jams with dolosse.
- Placement of boulders, roadway aggregate, and timber piles.
- Environmental design elements such as root wads, bank stabilization (dolos-deflector log bundles), and coarse woody debris.
- Erosion and sediment control measures, including fiber rolls and rolled erosion control products.
- Temporary stream diversion and turf establishment (seeding or mulching).
- Implementation of various traffic control measures (markers, warning lights, flaggers, construction signs) to manage traffic on Road 107.
Contract & Timeline
- Opportunity Type: Presolicitation
- Estimated Price Range: $2,000,000 to $5,000,000
- Project Length: 0.12 Miles
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Tentative Solicitation Date: Spring 2026
- Tentative Fixed Completion Date: Fall 2026
Evaluation
Evaluation criteria are not specified in this presolicitation notice.
Additional Notes
The work will utilize US Customary Units and FP-24 specifications. Prospective bidders are encouraged to view the project site, though no