WMF Saco RD Electrical Panel

SOL #: 12445526Q0005Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 13
Atlanta, GA, 303092449, United States

Place of Performance

NH

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components (J059)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 13, 2026
2
Last Updated
Feb 19, 2026
3
Submission Deadline
Feb 24, 2026, 1:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting quotes (RFQ 12445526Q0005) for electrical upgrades and transformer replacement at the White Mountain National Forest in Conway, NH (Saco Ranger District) and Campton, NH (WMF Headquarters). This is a Total Small Business Set-Aside. The work addresses non-compliant electrical systems and a lightning-damaged transformer, requiring adherence to NFPA National Electric Code 2023. Quotes are due February 24, 2026, at 08:00 AM EST.

Scope of Work

The project involves two primary locations:

  • Saco Ranger District (Conway, NH): Upgrade a 400-ampere circuit breaker/current transformer cabinet, a 400-ampere electrical panel, and a 24-circuit load center. Existing Federal Pacific equipment must be replaced due to non-compliance.
  • WMF Headquarters (Campton, NH): Remove a damaged transformer from the "Unheated Warehouse," assess and replace any damaged wiring, conduit, circuit breakers, or grounding material, and install a new 400-ampere step-down transformer. The contractor must furnish all labor, materials, equipment, supervision, and transportation. All work must comply with NFPA National Electric Code 2023, applicable FAR/AGAR clauses, and prevailing wage rates for Carroll and Grafton Counties, NH. Any damaged wiring, breakers, or grounding identified during assessment must be included in the base quote. All circuits must be operational within five days of work commencement.

Contract Details

  • Opportunity Type: Combined Synopsis/Solicitation (RFQ 12445526Q0005)
  • Set-Aside: Total Small Business Set-Aside (NAICS 238210, $19 Million size standard)
  • Award Type: Anticipated single award, Firm Fixed-Price.
  • Performance Period: 90 days after the Notice To Proceed (NTP). The estimated project start date is March 2, 2026.
  • Place of Performance: Conway, NH and Campton, NH.

Submission & Evaluation

  • Submission Method: Email completed quotes to kevin.brown2@usda.gov.
  • Quote Due Date: February 24, 2026, at 08:00 AM EST.
  • Offer Acceptance: Quotes must be held firm for 90 calendar days.
  • Evaluation Criteria: Award will be made to the responsible and acceptable contractor offering the lowest price to the government. Acceptability is based on compliance with the solicitation, and responsibility is determined by factors such as past performance and financial health. Bidders must provide pricing for all items listed in Attachment 02, Schedule of Items, to avoid disqualification.

Additional Notes

Site visits for both locations were held on January 29, 2026. Three amendments have been issued, with Amendment 0003 extending the quote due date and adding a vendor Q&A document. Amendment 0002 added visual documentation (Attachment 6) of existing electrical infrastructure. The government will obtain necessary permits.

People

Points of Contact

Kevin BrownPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Combined Synopsis/Solicitation
Posted: Feb 19, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Feb 11, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Jan 27, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Jan 23, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Jan 13, 2026
View
WMF Saco RD Electrical Panel | GovScope