WMF Saco RD Electrical Panel
SOL #: 12445526Q0005Combined Synopsis/Solicitation
Overview
Buyer
Agriculture
Forest Service
USDA-FS, CSA EAST 13
Atlanta, GA, 303092449, United States
Place of Performance
NH
NAICS
Electrical Contractors and Other Wiring Installation Contractors (238210)
PSC
Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components (J059)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Jan 13, 2026
2
Last Updated
Feb 19, 2026
3
Submission Deadline
Feb 20, 2026, 10:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is seeking quotations for electrical panel upgrades and transformer replacement at the White Mountain National Forest (WMF) Saco Ranger District in Conway, NH, and the WMF Headquarters in Campton, NH. This is a Total Small Business Set-Aside opportunity. Quotes are due by February 20, 2026, at 5:00 PM Eastern.
Scope of Work
This acquisition involves two primary locations:
- Saco Ranger District (Conway, NH):
- Upgrade one 400-ampere circuit breaker/current transformer cabinet.
- Upgrade one 400-ampere electrical panel with breakers.
- Upgrade one 24-circuit load center with breakers.
- Ensure all grounding, wiring, and materials comply with NFPA National Electric Code (NEC) 2023.
- Remove all upgraded components and generated waste.
- WMF Headquarters (Campton, NH):
- Remove a damaged transformer from the "Unheated Warehouse."
- Assess and replace any damaged wiring, conduit, circuit breakers, or grounding material.
- Install one 400-ampere step-down transformer (Input: 480V, Output: 240V, 3-Phase).
- Commission all installed equipment for proper functioning.
- Aluminum wiring is acceptable if NEC compliant.
Contract Details
- Type: Combined Synopsis/Solicitation (Request for Quotation - RFQ).
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- NAICS: 238210 - Electrical Contractors and Other Wiring Installation Contractors (Small Business Size Standard: $19 Million).
- PSC: J059 - Maintenance, Repair And Rebuilding Of Equipment: Electrical And Electronic Equipment Components.
- Period of Performance: 90 days after Notice To Proceed (NTP). Anticipated project start is around March 2, 2026.
- Place of Performance: Conway, NH (Carroll County) and Campton, NH (Grafton County).
Key Dates & Site Visits
- Solicitation Published: January 23, 2026.
- Site Visits (Mandatory/Highly Recommended): Thursday, January 29, 2026.
- Conway, NH: 9:00 AM EST at 33 Kancamagus Hwy. Hosted by Michelle Hanson (michelle.hanson@usda.gov).
- Campton, NH: 1:00 PM EST at 71 White Mountain Dr. Hosted by Leah Jackman (Leah.Jackman@usda.gov).
- Quote Due Date: February 20, 2026, by 5:00 PM Eastern.
Submission & Evaluation
- Submission Method: Email completed quotes to kevin.brown2@usda.gov.
- Pricing: Offerors must provide pricing for all items listed in "Attachment 2 - Schedule Of Items" and hold prices firm for 90 calendar days.
- Evaluation Criteria: Award will be made to the responsible and acceptable contractor whose quote represents the lowest price to the government. Acceptability is based on compliance with the solicitation; responsibility is determined by the Contracting Officer.
- Acknowledgement: Offerors must acknowledge receipt of Amendment 0001. Failure to do so may result in offer rejection.
Important Notes
- Contractors must comply with prevailing wage rates for Carroll County (NH20260016) and Grafton County (NH20260018), as detailed in Attachments 4 and 5.
- All work must adhere to federal, state, and local regulations, including NFPA National Electric Code.
- The contractor is responsible for providing all equipment, supplies, personnel, supervision, materials, and quality control.
People
Points of Contact
Kevin BrownPRIMARY
Files
Versions
Version 5
Combined Synopsis/Solicitation
Posted: Feb 19, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Feb 11, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Jan 27, 2026
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Jan 23, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Jan 13, 2026