WY NPS YELL 10(26), Gardner River High Bridge
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Highway Administration (FHWA), Western Federal Lands Division, is soliciting proposals for the WY NPS YELL 10(26), Gardner River High Bridge project. This is a Task Order Request for Proposals (TORP) under the existing Yellowstone, Grand Teton, and Surrounding Area Multiple Award Task Order Contract (MATOC). Proposals will only be accepted from the six pre-selected prime contractors listed in the solicitation. The project involves comprehensive bridge rehabilitation and associated roadwork in Yellowstone National Park, Wyoming, with an estimated value of $20 - $30 Million. The response deadline is January 30, 2026.
Scope of Work
The project entails the rehabilitation of the Gardner River High Bridge, spanning 0.32 miles. Key deliverables include:
- Installation of containment systems and removal of lead-based paint.
- Painting of the bridge structure.
- Replacement of concrete approach spans and bridge joints.
- Installation of deep patches at bridge approaches.
- Construction of concrete guardwalls.
- Application of a thin epoxy overlay across the bridge deck.
- Minor bridge repairs and paving of bridge approaches.
- Extensive structural, concrete, and steel repairs, utility work, and catwalk repair.
Contract Details
- Contract Type: Firm-fixed-price Task Order under a MATOC.
- Estimated Value: $20,000,000 to $30,000,000 (corrected from initial $5-10M estimate).
- Period of Performance: Completion by October 19, 2027, with a Notice to Proceed assumed by March 30, 2026.
- Eligibility: Limited to H-K Contractors, Inc., M.A. Deatley Construction, Inc., Missouri River Contractors, LLC, Oftedal Construction, Inc., Rivierside Contracting Inc., and Sundt Construction, Inc.
- Set-Aside: None (limited competition under MATOC). Large businesses are required to submit a subcontracting plan.
- Location: Gardner River, Park County, Wyoming, 1.5 miles southeast of Mammoth.
Submission & Evaluation
- Proposal Due Date: January 30, 2026, by 22:00 UTC.
- Submission Method: Printed copy of bid to the address listed on SF 1442; electronic bids will not be accepted.
- Evaluation: Selection will be based on the lowest price.
- Site Visit: Offerors are urged and expected to inspect the site.
- Bid Bond: Required.
- Questions: General questions to wfl.contracts@dot.gov or 360-619-7520. Technical questions to wfl.plans-spec@dot.gov.
Key Clarifications & Notes
Multiple clarifications have been issued, confirming the project's estimated value at $20-30 Million and indicating that several details regarding scope, quantities, and technical requirements will be addressed via forthcoming amendments. Bidders should monitor SAM.gov for these updates. Environmental compliance, including a Stormwater Pollution Prevention Plan (SWPPP) and weed inspection for equipment, is critical. No contractor housing sites are provided by the government.