WY NPS YELL 10(26), Gardner River High Bridge
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Highway Administration (FHWA), under the Department of Transportation, has issued a Task Order Request for Proposals (TORP) for the WY NPS YELL 10(26), Gardner River High Bridge project in Yellowstone National Park, Wyoming. This firm-fixed-price contract, estimated between $20 - $30 Million, is for the comprehensive rehabilitation of the Gardner River High Bridge. Proposals are due by January 30, 2026.
Scope of Work
The project involves extensive rehabilitation of the Gardner River High Bridge, spanning 0.32 miles. Key tasks include:
- Installation of containment systems and removal of existing lead-based paint from all surfaces.
- Painting of the bridge structure.
- Replacement of concrete approach spans and installation of deep patches at bridge approaches.
- Construction of concrete guardwalls and replacement of bridge joints.
- Application of a thin epoxy overlay across the bridge deck.
- Minor bridge repairs and paving of bridge approaches.
- Compliance with FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects.
Contract & Timeline
- Contract Type: Firm-Fixed-Price Task Order
- Estimated Value: $20,000,000 - $30,000,000
- Period of Performance: Completion by October 19, 2027, with an assumed Notice to Proceed by March 30, 2026.
- Response Due: January 30, 2026, 10:00 PM UTC
- Published Date: January 26, 2026
- Set-Aside: This opportunity is solely for the listed prime contractors under the Yellowstone, Grand Teton, and Surrounding Area Multiple Award Task Order Contract (MATOC).
Key Updates & Clarifications
Amendment A001 (posted January 26, 2026) revises the solicitation, confirming the estimated price range of $20 - $30 Million. It also updates the Davis-Bacon General Wage Decision, adds "Masterworks" language to various Special Contract Requirements sections for electronic documentation, and includes additional information and drawings to specific plan sheets. Previous Q&A documents (dated December 31, 2025, January 16, 2026, January 21, 2026, and January 26, 2026) provided clarifications on project magnitude, traffic control, excavation limits, repair details, and environmental requirements, many of which are now incorporated or further detailed in the amendment.
Submission & Evaluation
Proposals must be submitted as a printed copy; electronic bids will not be accepted. Offerors must acknowledge receipt of Amendment A001. The selection of the successful offeror will be based on the lowest price. General and technical questions were accepted until five business days before the due date.
Additional Notes
This solicitation is advertised on SAM.gov to assist potential subcontractors by publicizing opportunities. Prospective bidders are encouraged to review detailed engineering plans, survey data, and environmental compliance requirements (SWPPP) available in the attachments. Site inspection during fall was recommended due to potential snow cover during the advertised period.