WY NPS YELL 10(26), Gardner River High Bridge
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Highway Administration (FHWA), Western Federal Lands Highway Division, is soliciting proposals for the WY NPS YELL 10(26), Gardner River High Bridge project in Yellowstone National Park, Wyoming. This Task Order Request for Proposals (TORP) is exclusively for pre-qualified prime contractors under the Yellowstone, Grand Teton, and Surrounding Area Multiple Award Task Order Contract (MATOC). The project involves comprehensive bridge rehabilitation and associated roadwork, with an estimated value of $20 - $30 Million. Proposals are due by January 30, 2026, at 2:00 p.m. MST.
Scope of Work
This project, spanning 0.32 miles, focuses on the rehabilitation of the Gardner River High Bridge, located approximately 1.5-1.8 miles east/southeast of Mammoth, Wyoming. Key deliverables include:
- Installation of containment systems and removal of lead-based paint.
- Painting of the bridge structure.
- Replacement of concrete approach spans and deep patching at bridge approaches.
- Construction of concrete guardwalls and replacement of bridge joints.
- Application of a thin epoxy overlay across the bridge deck.
- Minor bridge repairs and paving of bridge approaches.
- Extensive structural work, including deck repair, structural steel repair, railing replacement, and drainage.
- Implementation of detailed temporary and permanent traffic control plans, including road use restrictions and potential nighttime closures.
- Adherence to environmental protection measures, including a Stormwater Pollution Prevention Plan (SWPPP) and strict controls for dirt, plant, and foreign material.
Contract Details
- Solicitation Number: 69056726R000002
- Contract Type: Firm-fixed-price Task Order under MATOC.
- Estimated Value: $20 - $30 Million (corrected from initial $5-10M estimate).
- Set-Aside: Restricted to specific prime contractors under the Yellowstone, Grand Teton, and Surrounding Area MATOC.
- Completion Date: Tentatively October 19, 2027 (assuming Notice to Proceed by March 30, 2026).
- Evaluation: Selection will be based on the lowest price.
Key Dates & Actions
- Proposal Due Date: January 30, 2026, at 2:00 p.m. MST.
- Submission: Printed copies of proposals must be submitted; electronic bids are not accepted.
- Site Inspection: Offerors are urged to inspect the site.
- Amendments: Multiple amendments (A001, A002) and Q&A documents have been issued, clarifying pricing adjustments, progress payments, project magnitude, and technical requirements. Bidders must acknowledge all amendments.
Additional Notes
This opportunity is advertised on SAM.gov to inform potential subcontractors of opportunities. Prime contractors are required to submit a bid bond. The project adheres to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24.