Y--NGWSP BLOCK 2-3 HDD

SOL #: 140R4026R0002Solicitation

Overview

Buyer

Interior
Bureau Of Reclamation
UPPER COLORADO REGIONAL OFFICE
SALT LAKE CITY, UT, 84138, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Water Supply Facilities (Y1NE)

Set Aside

No set aside specified

Timeline

1
Posted
Oct 6, 2025
2
Last Updated
Feb 3, 2026
3
Submission Deadline
Feb 25, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, Bureau of Reclamation is soliciting proposals for the Navajo-Gallup Water Supply Project (NGWSP) Block 2-3 Horizontal Directional Drilling (HDD). This Firm Fixed-Price contract, estimated between $30,000,000 and $60,000,000, involves the construction of buried water transmission pipelines in New Mexico. Proposals are due February 25, 2026, at 1:00 PM MT.

Scope of Work

This project requires Horizontal Directional Drilling (HDD) for multiple water transmission pipelines:

  • A 42-inch pipeline at Reach 2 Nenahnezad Bluff (approx. 3,295-foot bore length).
  • Three 36-inch pipelines at Reach 2 Shumway Arroyo (approx. 2,000-foot bore length), Reach 2 San Juan River (approx. 2,400-foot bore length), and Reach 3 Chaco River (approx. 2,080-foot bore length). The scope includes all associated work for turnkey pipe installation, such as pilot bores, conductor casing, access roads, and water for dust abatement. The contractor must provide full-time safety, quality control, and qualified survey personnel.

Contract & Timeline

  • Contract Type: Firm-Fixed Price (FFP).
  • Estimated Magnitude: $30,000,000 to $60,000,000.
  • Period of Performance: May 20, 2026, to September 21, 2027 (approximately 469 calendar days). Performance must begin within 21 calendar days of receiving notice to proceed.
  • Liquidated Damages: $11,525.00 per calendar day of delay.
  • Location: Block 2-3 pipeline alignment, New Mexico, extending from south of Frank Chee Willetto Reservoir to the San Juan Lateral Water Treatment Plant.

Submission & Evaluation

  • Proposal Submission Deadline: February 25, 2026, at 1:00 PM MT.
  • Submission Method: Electronic, via Microsoft Teams or Kiteworks.
  • Proposal Validity: Offers must be valid for at least 60 calendar days.
  • Evaluation Factors: Proposals will be evaluated on Technical Approach, Staff Qualifications & Key Personnel & Experience, Quality Control, Past Performance & Safety, and Cost/Price. Technical factors (1-3) are considered approximately equal and more important than Cost/Price.

Key Updates & Requirements

  • Amendments: Multiple amendments have been issued, updating specifications (e.g., SPEC 33 05 22 HDD, 09 96 20 Coatings), proposal instructions, price schedules, and drawings. Bidders must acknowledge all amendments.
  • Technical Clarifications: HDD reaming step sizes are generally limited to 12 inches per pass, with Nenahnezad Bluff specifically limited to 6 inches. 36" DR21 FPVC is not acceptable for the San Juan River crossing. Land farming of drilling fluids is acceptable.
  • Work Restrictions: Drilling at Shumway Arroyo HDD is restricted to November 1 through February 28.
  • Taxes & Wages: New Mexico Gross Receipts Tax and Navajo Nation Tax are reimbursable but must be included in price proposals. Prevailing wage rates for Building and Heavy Construction in San Juan County, NM, apply.
  • Eligibility: Indian Preference requirements and Small Business representations are detailed in the solicitation.

Contact Information

For inquiries, contact Amy Loveless at aloveless@usbr.gov or 801-524-3790.

People

Points of Contact

Loveless, AmyPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8Viewing
Solicitation
Posted: Feb 3, 2026
Version 7
Solicitation
Posted: Jan 29, 2026
View
Version 6
Solicitation
Posted: Jan 16, 2026
View
Version 5
Solicitation
Posted: Dec 10, 2025
View
Version 4
Solicitation
Posted: Dec 5, 2025
View
Version 3
Solicitation
Posted: Nov 17, 2025
View
Version 2
Pre-Solicitation
Posted: Oct 31, 2025
View
Version 1
Pre-Solicitation
Posted: Oct 6, 2025
View
Y--NGWSP BLOCK 2-3 HDD | GovScope