Y--Pojoaque Basin Regional Water System Phase II Desi

SOL #: 140R4025R0032Solicitation

Overview

Buyer

Interior
Bureau Of Reclamation
UPPER COLORADO REGIONAL OFFICE
SALT LAKE CITY, UT, 84138, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Water Supply Facilities (Y1NE)

Set Aside

No set aside specified

Timeline

1
Posted
Sep 17, 2025
2
Last Updated
Apr 28, 2026
3
Submission Deadline
May 15, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Bureau of Reclamation, Upper Colorado Regional Office is soliciting proposals for a Hybrid Fixed Price and Progressive Design-Build contract for Phase II of the Pojoaque Basin Regional Water System (PBRWS). This project involves designing and constructing water infrastructure to deliver 4,000 acre-feet of water annually to several Pueblos and Santa Fe County in New Mexico. The estimated budget ranges from $180 million to $300 million. Phase One Qualifications are due September 15, 2025.

Project Overview

This opportunity, identified as Solicitation 140R4025R0032, is for the Pojoaque Basin Regional Water System Phase II, located approximately 15 miles north of Santa Fe, New Mexico. The project aims to expand the water system to deliver 4,000 acre-feet of water per year, with a peak daily demand of 6.23 million gallons per day, meeting federal clean drinking water standards. It will serve the Pueblos of San Ildefonso, Pojoaque, Nambé, and Tesuque, as well as a portion of Santa Fe County. Phase 1 of the PBRWS is currently under construction.

Contract Details

  • Contract Type: Hybrid Fixed Price and Progressive Design-Build. This involves an iterative design and cost-estimation process, culminating in a firm-fixed price proposal for the construction phase.
  • Estimated Budget: $180,000,000 - $300,000,000.
  • Period of Performance: 180 days for design and 90% design review, followed by 1,120 days for construction, commissioning, and performance testing, totaling approximately 1,300 days.
  • NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction (Size Standard: $45 million).
  • PSC Code: Y1NE - Construction Of Water Supply Facilities.
  • Set-Aside: Full and open competition; no set-aside.
  • Minimum Bonding Capacity: $280,000,000.

Submission & Evaluation

This is a two-phase design-build selection process:

  • Phase One (Qualifications): Offerors submit qualifications based on:
    • Technical Qualifications: Experience with up to three projects per specialty (Designer, Builder, Construction Inspection, Cultural Monitoring) completed in the last 10 years.
    • Project Team Organization and Key Personnel.
    • Past Performance Questionnaires (PPQs): Due by May 15, 2026 (for references to submit).
    • Note: The "General Technical Approach" factor has been deleted. These three factors are of equal importance.
  • Phase Two (Request for Proposals): The three most highly qualified firms from Phase One will be invited to submit:
    • Design Concept
    • Technical Approach
    • Small Business Participation and Teaming Agreements
    • Complete Pricing Schedule
    • Technical factors combined are significantly more important than Price.
  • Stipend: A $250,000 stipend will be provided to unsuccessful Phase II Offerors who submit complete Phase II proposals.
  • Proposal Due (Phase One Qualifications): September 15, 2025.
  • Submission Method: Electronic submission to mary_maestas@ios.doi.gov.

Key Requirements

  • Design and construct approximately 40 miles of pipeline, new pump stations, and tanks, integrating with existing Phase 1 infrastructure.
  • Contractor is responsible for verifying and validating government-furnished design documents (60-100% complete).
  • Deliverables include 100% design, construction, testing, startup, commissioning, as-built drawings, operator training, and 6 months of technical support.
  • Compliance with federal, state, and tribal regulations, including environmental and cultural resource commitments.
  • Implementation of an effective safety program.
  • Independent subcontractors are required for Cultural Monitoring Services and Construction Inspection Services.

Important Notes

  • Offerors must be registered in the System for Award Management (SAM).
  • A pre-award site visit is intended; details will be in Section L of the solicitation.
  • Questions should be submitted in writing via email to Mary Maestas (mary_maestas@ios.doi.gov).

People

Points of Contact

Maestas, MaryPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6Viewing
Solicitation
Posted: Apr 28, 2026
Version 5
Solicitation
Posted: Apr 24, 2026
View
Version 4
Solicitation
Posted: Apr 20, 2026
View
Version 3
Solicitation
Posted: Apr 13, 2026
View
Version 2
Pre-Solicitation
Posted: Mar 4, 2026
View
Version 1
Sources Sought
Posted: Sep 17, 2025
View
Y--Pojoaque Basin Regional Water System Phase II Desi | GovScope