Y1DA--534-26-3-5788-0016 / 534-25-102 Renovate Canteen Kitchen PH2 / (VA-26-00031573)

SOL #: 36C24726R0073Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
247-NETWORK CONTRACT OFFICE 7 (36C247)
AUGUSTA, GA, 30904, United States

Place of Performance

Charleston, SC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Hospitals And Infirmaries (Y1DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Apr 24, 2026
2
Last Updated
Jun 4, 2026
3
Submission Deadline
Jun 18, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), specifically the 247-Network Contract Office 7, has issued Solicitation Number 36C24726R0073 for the Renovation of the Canteen Kitchen Phase II at the Ralph H. Johnson VA Medical Center in Charleston, SC. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside for a Firm Fixed-Price construction contract. Proposals are due by June 18, 2026, at 1:00 PM EST.

Scope of Work

This project, identified as 534-25-102, involves the comprehensive renovation of the canteen kitchen. Key tasks include the demolition of the existing front-line grill hood, fire suppression system, ductwork, and exhaust fan. New installations will include a front-line hood, fire suppression system, dedicated air handler, exhaust fan, and associated ductwork. The project also requires the installation of two existing fabricated canteen kitchen hoods with their associated exhaust, ductwork, electrical, and controls. Work must adhere to provided drawings, specifications, and the Statement of Work, while minimizing disruption to VAHCS operations. A "Limited Hazardous Materials Survey Report Update" identifies asbestos-containing materials (ACM) requiring abatement by a licensed contractor prior to renovation.

Contract Details

This is a Firm Fixed-Price (FFP) Construction Contract. The estimated construction magnitude is between $500,000 and $1,000,000. The period of performance is 180 calendar days after the Notice to Proceed. Invoicing must be submitted electronically via the Tungsten Network, and vendors must register with Tungsten and update information in the Customer Engagement Portal (CEP). Davis-Bacon Act prevailing wage rates apply.

Submission & Evaluation

Proposals are due by June 18, 2026, at 1:00 PM EST and must be submitted electronically via email to Pamela.Moffitt@va.gov. Submissions require Volume I (Price and Contract Forms) and Volume II (Technical Proposal). Evaluation will follow a Lowest Price Technically Acceptable (LPTA) approach, with key factors including Qualifications, Key Subcontractors (with revised criteria per Amendment 0003), and Project Execution. Offerors must be registered in SAM.gov and VetCert, comply with VETS 4212, and submit a VAAR 852.219-75 Limitation on Subcontracting Certificate and a proposal guarantee (SF 24).

Key Documents & Amendments

Amendment 0004 (June 4, 2026) added the "Charleston VA Canteen Kitchen Hood Basis of Design" and the "EN257341 Ralph H Johnson VA Medical Center Canteen Hazmat Phase 2 PDF" documents, which detail technical specifications and hazardous material findings. Amendment 0003 (June 4, 2026) extended the proposal due date to June 18, 2026, revised evaluation criteria for Key Subcontractors, and provided updated specifications and drawing A102. An RFI log and site visit sign-in sheet are also available.

Additional Notes

A site visit was held on May 15, 2026, and attendance was encouraged but not mandatory. Requests for Information (RFIs) were due by May 20, 2026. The VA is still advising on whether the Superintendent can also serve as the Site SSHO and Site CQC manager.

People

Points of Contact

Pamela R MoffittContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7Viewing
Solicitation
Posted: Jun 4, 2026
Version 6
Solicitation
Posted: Jun 4, 2026
View
Version 5
Solicitation
Posted: May 11, 2026
View
Version 4
Solicitation
Posted: May 11, 2026
View
Version 3
Solicitation
Posted: May 8, 2026
View
Version 2
Solicitation
Posted: May 7, 2026
View
Version 1
Pre-Solicitation
Posted: Apr 24, 2026
View
Y1DA--534-26-3-5788-0016 / 534-25-102 Renovate Canteen Kitchen PH2 / (VA-26-00031573) | GovScope