YRBM-58 Berthing Barge Removal, Storage and Delivery of Mattresses
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVSUP FLT LOG CTR YOKOSUKA is soliciting proposals for the removal, climate-controlled storage, and delivery of approximately 300 mattresses from the YRBM-58 berthing barge at Naval Base Guam, Hagatna, GU. This is a Total Small Business Set-Aside. Proposals are due February 17, 2026, at 09:00 AM Local Time.
Scope of Work
The contractor will be responsible for:
- Mattress Removal: Carefully removing approximately 300 twin-sized mattresses (40-50 lbs, 6-8" thick) from the 4-level YRBM-58 berthing barge, which is accessible only by stairs. Removal must be completed within 3 business days of Notice to Proceed (NTP).
- Transportation: Transporting mattresses to a contractor-provided climate-controlled storage facility using covered or enclosed vehicles, complying with base access requirements.
- Climate-Controlled Storage: Providing a secure, indoor facility maintaining temperatures between 68-75°F and relative humidity between 40-60%. Mattresses must be stored elevated, protected from pests, moisture, and direct sunlight, with a minimum of a combo or key lock for security. An inventory log must be maintained.
- Accountability & Reporting: Providing a receipt/inventory list upon pickup and maintaining a storage log.
- Return Delivery: Returning all mattresses to Naval Base Guam upon Government request within 5 business days, in the same condition as received. The total removal and delivery timeframe should not exceed one week.
Contract & Timeline
- Contract Type: Firm Fixed Price
- Period of Performance: March 2, 2026 – June 20, 2026. No option periods are anticipated.
- Offer Due Date: February 17, 2026, at 09:00 AM Local Time.
- Questions Due: February 9, 2026 (COB).
Submission & Evaluation
- Submission: Offerors must submit proposals on Standard Form 1449 and include Past Performance Information (PPI).
- Past Performance: Complete Attachment 2 - PPI form for current or previous contracts (one form per contract, maximum five, within 3 years of completion).
- Evaluation: Award will be based on Price and Past Performance (Best Value Trade Off).
- Eligibility: This is a competitive, total small business set-aside action among sources authorized to operate and do business in Guam. Additional documentation may be required to demonstrate ability to perform in Guam.
Key Clarifications
- The barge has 4 levels, accessible only by stairs. Mattresses are located on each floor.
- Storage requires a combo lock or key lock.
- The performance period represents the entire required storage duration; no storage is needed before or after these dates.
- Offerors should plan for maximum capacity at the start of performance. Phasing will be considered for unforeseen circumstances, not exceeding one week.
- Work hours for removal are expected between 0800-1530 M-F as needed.
- Photos of access points and mattresses will be provided.
Additional Notes
The solicitation references a Performance Work Statement (PWS) for further details. Several image files (IMG_6964.jpeg, IMG_6958.jpeg, IMG_6957.jpeg, IMG_6961.jpeg) are included, potentially serving as visual aids for the work environment or logistics, as mentioned in the Q&A.