Z1DA--NRM| 503-21-102 Correct FCA Electrical Deficiencies Phase 1 (VA-26-00004932)

SOL #: 36C24426R0017Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
244-NETWORK CONTRACT OFFICE 4 (36C244)
PITTSBURGH, PA, 15215, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Maintenance Of Hospitals And Infirmaries (Z1DA)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 31, 2025
2
Last Updated
Feb 17, 2026
3
Submission Deadline
Feb 16, 2026, 9:30 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), VISN 04 Contracting Office, is issuing a Request for Proposal (RFP) for Construction Services to correct FCA Electrical Deficiencies Phase 1 at the Altoona VAMC in Altoona, PA. This is a Small Business Set-Aside with an estimated magnitude between $5M and $10M. Proposals are due by February 16, 2026, at 4:30 PM EST.

Scope of Work

The project involves comprehensive electrical construction services, including:

  • Construction of a new switchgear building.
  • Replacement of the campus 15KV switchgear.
  • Segregation of the building 1 essential electrical system.
  • Addressing distribution equipment with inadequate short circuit withstand ratings and working clearances. The contractor will provide all necessary labor, materials, equipment, tools, permits, licenses, and supervision, ensuring compliance with applicable codes and VA standards. Specific sole-source items, such as SALTO wireless door hardware, Honeywell Notifier fire alarm systems, Trane Tracer Ensemble BAS controls, Wattstopper DLM lighting control, Avigilon security cameras, and Inpro Contego signage, must be integrated.

Contract Details

  • Contract Type: Single, Firm Fixed-Price.
  • Magnitude: $5,000,000.00 to $10,000,000.00.
  • Period of Performance: 365 calendar days from Notice to Proceed.
  • NAICS: 236220 (Commercial & Institutional Building & Construction), $45M size standard.
  • Liquidated Damages: $582.98 per calendar day for inexcusable delays.
  • Bonds: A bid guarantee (20% of bid price, max $3M) and Performance and Payment Bonds are required.
  • Wage Rates: Prevailing wage rates per General Decision Number PA20260077 apply.

Submission & Evaluation

This is a Best Value Tradeoff solicitation for Small Businesses. Technical Capability (including Qualifications, Key Subcontractors, and Project Execution) and Past Performance are of equal weight and, combined, are significantly more important than Price.

  • Proposals Due: February 16, 2026, 4:30 PM EST.
  • Mandatory Site Visit: January 22, 2026, 10:00 AM local time at Altoona VAMC.
  • RFIs Due: January 30, 2026, 4:30 PM EST, submitted via email to kaitlyn.szlachta@va.gov.
  • Registration: Offerors must be registered in SAM and verified in VA's CVE (vetbiz.gov) at the time of proposal submittal.
  • Required Forms: Bidders must complete and submit forms for Past Performance Questionnaire (Exhibit C), Experience (Exhibit A), Subcontractor Information (Exhibit B), and Price Proposal Breakdown (Exhibit D).

Contact Information

For questions, contact Kaitlyn V Szlachta at kaitlyn.szlachta@va.gov.

People

Points of Contact

Kaitlyn V SzlachtaContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Solicitation
Posted: Feb 17, 2026
View
Version 5
Solicitation
Posted: Feb 6, 2026
View
Version 4Viewing
Solicitation
Posted: Jan 20, 2026
Version 3
Solicitation
Posted: Jan 16, 2026
View
Version 2
Solicitation
Posted: Jan 16, 2026
View
Version 1
Pre-Solicitation
Posted: Dec 31, 2025
View