Z1DA--NRM-CONST | 528A7-19-720 | Repair SPS Deficiencies

SOL #: 36C24226B0029Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
242-NETWORK CONTRACT OFFICE 02 (36C242)
ALBANY, NY, 12208, United States

Place of Performance

Syracuse, NY

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Maintenance Of Hospitals And Infirmaries (Z1DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Dec 18, 2025
2
Last Updated
Apr 29, 2026
3
Submission Deadline
Apr 30, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA) is soliciting bids for the Repair SPS Deficiencies project (Project: 528A7-19-720) at the Syracuse VA Medical Center in Syracuse, NY. This project involves comprehensive renovation and upgrade of the Sterile Processing Service (SPS) department to meet ISO 9001:2015 standards and VA directives. The magnitude of construction is estimated between $1,000,000.00 and $5,000,000.00. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. Offers are due by April 30, 2026, at 2:00 PM EDT.

Scope of Work

The project entails repairing and upgrading the existing SPS area, including noncompliant ceilings, floors, and walls. Key tasks include separating the cleaning scopes area from the preparation assembly area, maintaining pressure differentials, installing a pass-through window with a vented cabinet, relocating endoscope processing, constructing a cool-down room, and installing automated doors. The contractor will be responsible for removing, storing, and reinstalling SPS equipment, with the exception of the existing Cart Washer, which must be protected in place and its leaking drain repaired. The project is divided into five phases, including the setup and removal of temporary SPS outdoor units and renovation of specific rooms. Mandatory use of the VISN 2 Autodesk Build Construction management platform (ACC) is required for all submissions and correspondence.

Contract & Timeline

  • Contract Type: Firm-Fixed-Price
  • Period of Performance: 550 calendar days from Notice to Proceed (120 days for submittals, 430 days for construction).
  • Magnitude of Construction: $1,000,000.00 - $5,000,000.00
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB)
  • NAICS Code: 236220 (Commercial and Institutional Building Construction)
  • Small Business Size Standard: $45.0 Million
  • Offers Due: April 30, 2026, 2:00 PM EDT
  • Bid Opening: April 30, 2026, 2:15 PM EDT via Microsoft Teams
  • Questions Due (RFI): April 20, 2026, 12:00 PM EST (Answers provided in Amendment 0004)
  • Pre-bid Site Visit: Held on April 9, 2026, 11:00 AM EST

Submission Requirements

Bids must be emailed ONLY to terry.fraser@va.gov. Offerors must be registered in SAM.gov and verified/certified as SDVOSB in the SBA Small Business Search at the time of bid submission and before award. Required documents with the bid include Bid Bonds, Buy American Certificates (FAR 52.225-2), and VA Limitations on Subcontracting Certificates (VAAR 852.219-75). Offerors must acknowledge all solicitation amendments.

Key Clarifications

No designated laydown areas are permitted on drawings, and parking is limited to one dumpster or one parking spot. The government will not pay for stored materials or material costs past the initial period of performance. The Physical Access Control System will be included in project specifications. Apco is the Basis of Design for signs. The temporary SPS trailer rental and rigging are to be included in the GC contract. Contractor is responsible for disconnecting utilities, moving equipment to storage, storing for Phase 2, moving equipment back, and making all utility connections. Crane setup is limited to one day, performed on weekends or after hours with a required permit.

People

Points of Contact

Terry FraserContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
View

Versions

Version 9
Solicitation
Posted: Apr 29, 2026
View
Version 8Viewing
Solicitation
Posted: Apr 21, 2026
Version 7
Solicitation
Posted: Apr 10, 2026
View
Version 6
Solicitation
Posted: Mar 24, 2026
View
Version 5
Solicitation
Posted: Mar 24, 2026
View
Version 4
Solicitation
Posted: Mar 22, 2026
View
Version 3
Solicitation
Posted: Mar 20, 2026
View
Version 2
Solicitation
Posted: Mar 20, 2026
View
Version 1
Pre-Solicitation
Posted: Dec 18, 2025
View