Z1DA--NRM-CONST | 528A7-19-720 | Repair SPS Deficiencies

SOL #: 36C24226B0029Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
242-NETWORK CONTRACT OFFICE 02 (36C242)
ALBANY, NY, 12208, United States

Place of Performance

Syracuse, NY

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Maintenance Of Hospitals And Infirmaries (Z1DA)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Dec 18, 2025
2
Last Updated
May 22, 2026
3
Submission Deadline
May 26, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), Network Contract Office 02, is soliciting bids for the Repair SPS Deficiencies project (Project No. 528A7-19-720) at the Syracuse VA Medical Center in Syracuse, NY. This project involves comprehensive renovation and upgrade of the Sterile Processing Service (SPS) department to meet current standards. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. The magnitude of construction is estimated between $1,000,000.00 and $5,000,000.00.

Scope of Work

The project's primary goal is to repair and upgrade the SPS department to comply with ISO 9001:2015 standards, VA Directive VHA-1116(2), and VA Design Guide PG-18-12. Key tasks include renovating ceilings, floors, and walls; separating the cleaning scopes area from the preparation assembly area; maintaining pressure differentials; installing a pass-through window with a vented cabinet; relocating endoscope processing; constructing a cool-down room; and installing automated doors. The work is divided into five phases, including the setup and removal of a temporary SPS area. Contractors are responsible for the removal, storage, and reinstallation of existing SPS equipment (excluding the existing Cart Washer, which must be protected in place and its leaking drain repaired). This includes utility disconnections, storage in the contractor's warehouse under specified climate control (68°F +/- 2°, 40% +/- 5% humidity), and reinstallation of utilities and stainless steel panels. Mandatory use of the VISN 2 Autodesk Build Construction management platform (ACC) is required for all submissions and correspondence.

Contract Details

This is a Firm-Fixed-Price contract with a Period of Performance of 550 calendar days from the Notice to Proceed (120 days for submittals, 430 days for construction). The NAICS Code is 236220 (Commercial and Institutional Building Construction) with a small business size standard of $45.0 Million.

Eligibility & Submission

This procurement is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. Offerors must be registered in SAM.gov and verified/certified as SDVOSB in the SBA Small Business Search at the time of bid submission and before award. Required submissions with the bid include bid bonds, Buy American Certificates (FAR 52.225-2), and VA Limitations on Subcontracting Certificates (VAAR 852.219-75). Bids must be emailed ONLY to terry.fraser@va.gov.

Key Clarifications & Requirements

Responses to contractor questions clarify that no designated laydown areas or on-site parking are available. The government will not pay for stored materials or material cost increases beyond the initial period of performance. Section 28 13 00 (Physical Access Control System) will be included. Apco is the Basis of Design for signs. The temporary SPS trailer rental and rigging must be included in the GC contract. Contractors are responsible for commissioning all project aspects except for the equipment, which the VA will commission. Crane operations are limited to one day, on weekends or after hours, with contractor-provided supervision and safety. Offerors must acknowledge all amendments. Fellenzer Engineer or its subsidiaries are excluded from award.

Deadlines

  • Offers Due: May 26, 2026, at 2:00 PM EST.
  • Bid Opening: May 26, 2026, at 2:15 PM EST via Microsoft Teams.

People

Points of Contact

Terry FraserContract SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
View

Versions

Version 14
Solicitation
Posted: May 22, 2026
View
Version 13Viewing
Solicitation
Posted: May 22, 2026
Version 12
Solicitation
Posted: May 18, 2026
View
Version 11
Solicitation
Posted: May 14, 2026
View
Version 10
Solicitation
Posted: May 7, 2026
View
Version 9
Solicitation
Posted: Apr 29, 2026
View
Version 8
Solicitation
Posted: Apr 21, 2026
View
Version 7
Solicitation
Posted: Apr 10, 2026
View
Version 6
Solicitation
Posted: Mar 24, 2026
View
Version 5
Solicitation
Posted: Mar 24, 2026
View
Version 4
Solicitation
Posted: Mar 22, 2026
View
Version 3
Solicitation
Posted: Mar 20, 2026
View
Version 2
Solicitation
Posted: Mar 20, 2026
View
Version 1
Pre-Solicitation
Posted: Dec 18, 2025
View
Z1DA--NRM-CONST | 528A7-19-720 | Repair SPS Deficiencies | GovScope