Z2DA--519-23-908 EHRM Tier 2 Data Center Construction - Big Spring
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA) is soliciting bids for the EHRM Tier 2 Data Center Construction project in Big Spring, TX. This project involves renovating existing space into a new data center. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Bids are due by February 3, 2026, at 12:00 PM ET.
Scope of Work
The selected General Contractor will provide all necessary tools, labor, materials, equipment, permits, licenses, supervision, and quality control to complete the construction in accordance with attached specifications and drawings. The project includes demolition, new construction, and specific requirements for architectural, mechanical, plumbing, electrical, telecommunications, and fire suppression systems. Bidders must account for the presence of asbestos-containing materials (ACMs) and lead-based paint (LBP) in Building 1, as detailed in provided reports and management plans. The project mandates the use of a web-based project management software for all communications and documentation. Specific brand-name items are required for the security camera (Motorola Avigilon), physical security access control (HID), and fire alarm (Siemens Desigo) systems to ensure compatibility with existing infrastructure.
Contract Details
- Contract Type: Firm-Fixed-Price
- Magnitude: Between $5,000,000 and $10,000,000
- Performance Period: 225 calendar days from Notice to Proceed
- Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB). Offerors must be SBA certified at the time of bid submission and award.
- Bonds: A Bid Guarantee (SF 24) of not less than 20% of the bid price (not to exceed $3,000,000) is required. Payment and Performance Bonds (SF 25A and SF 25) will be required upon award.
Submission & Evaluation
Bids are to be based on price only; no write-ups on past projects or Past Performance Questionnaires (PPQs) are required. Award will be made to the responsible bidder whose bid is most advantageous to the government, considering price. Offerors must acknowledge all amendments. Compliance with prevailing wage rates (latest Howard County, TX determination) and subcontracting limitations (85% for general construction to non-SDVOSB/VOSB) is mandatory.
Key Dates & Contacts
- Bid Due Date: February 3, 2026, at 12:00 PM ET
- Bid Opening: Teleconference on February 3, 2026, at 12:30 PM ET. Access code: 392 842 72#.
- Primary Contact: Devin Russell, Contract Specialist, devin.russell@va.gov
- Secondary Contact: Richelle N. Gray, Richelle.Gray@va.gov
Additional Notes
Multiple amendments have been issued, primarily extending the bid due date and providing clarifications, including answers to technical questions and updated wage determinations. A site visit was held on November 18, 2025. Bidders must adhere to VHA Infection Control Risk Assessment (ICRA) and Pre-Construction Risk Assessment (PCRA) protocols.