F--2-BACA_1-HAYSTACK SDV
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Interior, Bureau of Indian Affairs (BIA) Navajo Region, has issued a solicitation for the remediation and restoration of three former sheep dip vat (SDV) sites: Baca #1, Baca (New), and Haystack, located in Prewitt, New Mexico. This project aims to eliminate environmental hazards, specifically toxaphene contamination, and restore the land to its natural condition. Proposals are due February 13, 2026, at 4:00 PM MST.
Scope of Work
The contractor will provide all labor, materials, and equipment to perform:
- Site Assessments: Comprehensive sampling and analysis of soil and potentially water (including a nearby well at Haystack) using EPA Method 8081A to identify toxaphene, lindane, and arsenic levels.
- Remediation: Excavation and disposal of contaminated soils (estimated at 900 cubic yards) and concrete/debris (estimated at 554 tons) at a Subtitle D landfill.
- Restoration: Backfilling excavated areas with certified clean soil, compacting to 90% proctor density, and reseeding with native plant species.
- Compliance: Coordination with the Navajo Nation Historical Preservation and Fish & Wildlife departments for necessary archaeological and biological clearances.
Contract & Timeline
- Type: Firm-Fixed-Price (FFP) Purchase Order
- Duration: 120 calendar days from Notice to Proceed (Performance period through June 30, 2026)
- Set-Aside: 100% Indian Small Business Economic Enterprise (ISBEE)
- Response Due: February 13, 2026
- Published: February 10, 2026 (Amendment 0005)
Evaluation
Award will be based on a best-value determination considering the following factors in descending order of importance:
- Technical Approach
- Key Project Management/Technical Support (including experience on Tribal trust lands and PM resumes)
- Past Performance (3-5 references from the last 5 years)
- Price
Additional Notes
Bidders must submit a signed IEE Representation Form to be eligible. Site visits are permitted at the contractor's expense, though access to the Haystack site is restricted until project commencement.