B402 Install HVAC Chase Doors
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force (20 CONS) is soliciting proposals for the B402 Install HVAC Chase Doors project at Shaw AFB, SC. This effort involves the procurement and installation of specialized HVAC access panels to ensure functional building maintenance. This is a 100% Small Business Set-Aside with a performance period not to exceed 30 days. Proposals are due February 16, 2026.
Scope of Work
The contractor shall provide all management, labor, tools, and materials to install 40 new hinged HVAC chase doors. Key tasks include:
- Taking field measurements and ordering 16-gauge cold-rolled steel doors with continuous piano hinges and cam latches.
- Performing necessary drywall and framing work to accommodate new installations.
- Preparing and painting wall openings to match existing finishes (Sherwin Williams WS 7015 Repose Gray).
- Providing daily reports in RAKEN format and managing debris disposal off-base.
Contract & Timeline
- Type: Firm Fixed-Price (FFP)
- Set-Aside: 100% Small Business (NAICS 236220; Size Standard $45M)
- Period of Performance: 30 calendar days after Notice to Proceed (NTP)
- Site Visit: January 27, 2026, at 9:30 AM EST
- Questions Due: February 3, 2026
- Proposals Due: February 16, 2026, at 2:00 PM EST
Evaluation
Award will be made on a Lowest Priced, Technically Acceptable (LPTA) basis. Evaluation factors include Price, Technical Approach, and Explanation of Estimate. The government reserves the right to award without discussions.
Additional Notes
Performance and Payment Bonds are required for this project. All correspondence must be submitted electronically to the Contracting Officer and Contract Specialist.