CAR LIFT REPLACEMENTS
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Air Force Sustainment Center PZIMA, Robins AFB, GA, is soliciting quotes for Car Lift Replacements. This 100% Total Small Business Set-Aside opportunity requires the purchase, installation, and associated services for three double-sided automotive vehicle lifts at Robins Air Force Base, GA. The solicitation is issued as a Request for Quote (RFQ) under FAR Part 12, Simplified Acquisition Procedures, and will result in a Firm-Fixed Price (FFP) award. Quotes are due by February 18, 2026, at 09:30 AM EST.
Scope of Work
The contractor shall provide all materials, equipment, labor, transportation, shipping, setup, and installation for three double-sided Automotive Vehicle Lifts. This includes the disassembly, removal, and palletization of existing lifts, ensuring only one double-sided lift is out of service at any given time. The lifts must be capable of holding two F-15 Conformal Fuel Tanks simultaneously, with an expected capacity of 5,000 lbs per side (10,000 lbs total). Custom configurations are permissible. Functional testing of new lifts with F-15 Conformal Fuel Tanks is required. The government will provide crates for palletization of disassembled lifts.
Contract Details & Compliance
- Contract Type: Firm-Fixed Price (FFP)
- NAICS: 238290, Size Standard: $22,000,000
- Set-Aside: 100% Total Small Business
- Period of Performance: Delivery and installation of the first lift within 12 weeks after Government approval of drawings; remaining two lifts within 4 weeks after the first. Drawings of proposed lifts must be submitted within 4 weeks post-award.
- Key Deliverables: One paper and one electronic copy of the Operation/Maintenance Manual within 3 days post-installation, a standard one-year warranty on parts and workmanship, a Contractor's Safety Plan (draft within 10 working days post-award), and Accident/Incident Reports (as required).
- Mandatory Training: All contractor personnel working on Robins AFB must complete initial EMS Awareness Training and Energy Management System (EnMS) Training.
- Cybersecurity: NIST SP 800-171 applies. Offerors must have a satisfactory SPRS score of 110 (not more than three years old) to be considered for award.
Submission & Evaluation
Quotes will be evaluated based on the lowest price from a responsible offeror whose proposal conforms to the solicitation. Offerors must demonstrate adequate financial resources or the ability to obtain them, providing a narrative statement and substantiating documentation. A financial capability review will be conducted by DCMA. Payment requests and receiving reports must be submitted electronically via WAWF.
Key Dates & Contacts
- Quotes Due: February 18, 2026, 09:30 AM EST
- Submit Quotes To: joshua.belzince@us.af.mil (Contract Specialist) and joshua.sharpe.6@us.af.mil (Contracting Officer)