CAR LIFT REPLACEMENTS
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force, Air Force Sustainment Center PZIMA at Robins AFB, GA, is seeking proposals for Car Lift Replacements. This is a Firm-Fixed Price (FFP) contract, 100% set aside for Total Small Business. The requirement is to replace three double-sided automotive vehicle lifts. Quotes are due by March 11, 2026, at 09:30 AM EST.
Scope of Work
The contractor shall provide all materials, equipment, labor, transportation, shipping, setup, and installation for three double-sided Automotive Vehicle Lifts. This includes the disassembly, removal, and palletization of existing lifts. The new lifts must be capable of holding two F-15 Conformal Fuel Tanks (CFTs) simultaneously, with each double-sided lift comprising two 2-post lifts with independent controls. Only one double-sided car lift is to be out of service at any given time during the process. Functional testing of each new lift with F-15 CFTs is required, ensuring alignment with Special Tooling (X200315801).
Contract Details
- Contract Type: Firm-Fixed Price (FFP)
- Set-Aside: 100% Total Small Business
- NAICS Code: 238290 (Other Building Equipment Contractors) with a $22,000,000 size standard
- Period of Performance: Delivery and installation of the first lift within 12 weeks after Government approval of drawings; remaining two lifts within 4 weeks after the first is installed. A standard one-year warranty on parts and workmanship is required.
- Place of Performance: Robins Air Force Base, Warner Robins, GA 31098, United States
Submission & Evaluation
- Quotes Due: March 11, 2026, 09:30 AM EST
- Submission: Via email to Contract Specialist Joshua Belzince (joshua.belzince@us.af.mil) and Contracting Officer Joshua Sharpe (joshua.sharpe.6@us.af.mil).
- Evaluation: Award will be made to the responsible offeror with the lowest price conforming to the solicitation.
- Key Requirements:
- Financial Capability: Prospective vendors must provide documentation demonstrating adequate financial resources, including a narrative statement and substantiating documentation. A financial capability review will be conducted by DCMA.
- NIST SP 800-171 Compliance: Offerors must have a satisfactory score of 110 in the Supplier Performance Risk System (SPRS), not more than three years old, to be considered for award.
- Drawings of proposed new lifts must be submitted within four weeks after contract award for approval.
Key Deliverables & Compliance
- Operation/Maintenance Manual (paper and electronic copies) three days after installation.
- Contractor's Safety Plan (draft within 10 working days post-award).
- Accident/Incident Report (as required, with telephonic notification within four hours).
- Status Reports for Environmental Management System (EMS) and Energy Management System (EnMS) training (as required). All contractor personnel working on Robins AFB must complete initial EMS and EnMS Awareness Training.
- Compliance with DFARS 252.204-7012 (Safeguarding Covered Defense Information) and DFARS 252.240-7997 (DoD Assessment Requirements).
Important Notes
Vendor questions regarding this acquisition were no longer accepted after March 9, 2026, 2 PM EST.