Construct New School Drop Off Lane

SOL #: FA301026R0006Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA3010 81 CONS CC
KEESLER AFB, MS, 39534-2701, United States

Place of Performance

Biloxi, MS

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Apr 20, 2026
2
Last Updated
May 27, 2026
3
Submission Deadline
May 27, 2026, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for the construction of a new school drop-off lane at Keesler Air Force Base, Biloxi, MS. This project, valued between $1,000,000.00 and $3,000,000.00, is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. Proposals are due by May 27, 2026, at 09:00 AM CDT.

Scope of Work

The project involves the construction of a new school drop-off lane near the Pass Road access gate on Ploesting Drive. The scope includes:

  • Demolition: Removal of existing trees, picnic tables, concrete pads, a car wash, the old school drop-off area, storm drain manholes, bike racks, a water fountain, and canopies.
  • New Construction: Regrading for drainage, constructing a new paved road, creating a drop-off/pick-up area with 9 ft wide parking spots, installing signage and striping, a 30 ft x 20 ft aluminum canopy, and new storm drain inlets. Existing bike racks will be reinstalled, and a fire hydrant relocated.
  • Addendum 1 Changes: Abatement of approximately 17 feet of existing hydrant lateral and installation of a new 6-inch PVC pipe connecting to the existing 10-inch water main, due to suspected Asbestos Cement Pipe. Asbestos remediation procedures (UFGS 02 82 00) are now relevant.
  • Specifications: Detailed requirements for demolition, cast-in-place concrete, exterior signage, aluminum walkway covers, earthwork, geotextiles, base course drainage, asphalt mix design, concrete curbs/gutters/sidewalks, pavement markings, sodding, and stormwater utilities are provided.

Contract Details

  • Contract Type: Firm Fixed Price.
  • Period of Performance: Work is to begin within 10 calendar days after award and be completed within 180 calendar days. The anticipated period is from June 25, 2026, to December 22, 2026.
  • Set-Aside: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB).
  • Evaluation: Award will be based on a Lowest Price Technically Acceptable (LPTA) approach.
  • Funding: Funds are not presently available; award is contingent upon fund availability. The government reserves the right to cancel the solicitation.

Submission Requirements

Offerors must submit proposals in accordance with Section L, addressing proposal preparation, and Section M for evaluation factors. Key requirements include:

  • Acknowledgement: All amendments to the solicitation must be acknowledged.
  • Past Performance: Bidders must complete Attachment L-01 (Past Performance Reference List) and provide Attachment L-02 (Past Performance Questionnaire) to references for direct submission to the Contracting Officer.
  • Submittals: A Material Submittals Schedule (MSS) outlines required documentation, formats, quantities, and deadlines. Submittal procedures require contractor approval before submission and compliance with the Buy American Act.
  • Wage Determination: Compliance with prevailing wage rates for highway construction in Harrison County, MS (MS20260133) is mandatory, including Executive Order 13706 (Paid Sick Leave) and 13658 (Minimum Wage).

Key Dates & Contacts

  • Proposal Due Date: May 27, 2026, at 09:00 AM Central Daylight Time (UTC -5).
  • Primary Contact: Ty Le, ty.le@us.af.mil, 228-377-1822.
  • Secondary Contact: Tiffany Aultman, tiffany.aultman@us.af.mil, 228-377-1807.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Solicitation
Posted: May 27, 2026
View
Version 4Viewing
Solicitation
Posted: May 26, 2026
Version 3
Solicitation
Posted: May 13, 2026
View
Version 2
Solicitation
Posted: Apr 29, 2026
View
Version 1
Solicitation
Posted: Apr 20, 2026
View