Construct New School Drop Off Lane

SOL #: FA301026R0006Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA3010 81 CONS CC
KEESLER AFB, MS, 39534-2701, United States

Place of Performance

Biloxi, MS

NAICS

All Other Specialty Trade Contractors (238990)

PSC

Construction Of Other Non Building Facilities (Y1PZ)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Apr 20, 2026
2
Last Updated
May 27, 2026
3
Submission Deadline
May 27, 2026, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, 81 CONS CC, is soliciting proposals for the construction of a new school drop-off lane at Keesler Air Force Base, Biloxi, MS. This project, valued between $1,000,000 and $3,000,000, is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. The latest proposal due date is June 01, 2026, at 09:00 AM CDT.

Scope of Work

The project involves comprehensive site work to create a new school drop-off lane near the Pass Road access gate on Ploesti Drive. Key tasks include:

  • Demolition: Removal of trees, existing picnic tables, concrete pads, car wash, old drop-off area, storm drain manholes, bike racks, water fountain, and canopies.
  • New Construction: Regrading for drainage, constructing a new paved road, creating a drop-off/pick-up area, installing 9 ft wide parking spots, signage, striping, a 30 ft x 20 ft aluminum canopy, and new storm drain inlets.
  • Utility Work: Relocation of an existing fire hydrant and reinstallation of existing bike racks.
  • Asbestos Remediation: Abatement of approximately 17 feet of existing hydrant lateral and installation of a new 6-inch PVC pipe connecting to the existing 10-inch water main, due to suspected Asbestos Cement Pipe. UFGS 02 82 00 – Asbestos Remediation is now a relevant specification.
  • Coordination: Contractor must coordinate with City Light and Power (CLP) for light pole demolition and installation.

Contract & Timeline

  • Contract Type: Firm Fixed Price (FFP)
  • Magnitude: Between $1,000,000.00 and $3,000,000.00
  • Set-Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB)
  • Period of Performance: June 30, 2026, to December 28, 2026 (180 calendar days)
  • Proposal Due Date: June 01, 2026, 09:00 AM CDT
  • Published Date: May 27, 2026 (latest amendment)

Evaluation & Submission

Proposals will be evaluated using a Lowest Price Technically Acceptable (LPTA) approach. Offerors must meet all solicitation requirements, including terms, conditions, representations, certifications, and technical requirements. Key submission documents include:

  • Signed Standard Form 1442 and all amendments.
  • Past Performance Reference List (Attachment L-01).
  • Past Performance Questionnaire (Attachment L-02), to be completed by references and submitted directly to the Contracting Officer.
  • Compliance with the latest Wage Determination (MS20260133, dated 05/18/2026).
  • Adherence to Material Submittal Schedule (MSS) and Submittal Procedures, including Buy American Act compliance certification.

Important Notes

Funds are not presently available for this effort, and award is contingent upon fund availability. The Government reserves the right to cancel this solicitation without obligation to reimburse offerors for costs. Offerors must acknowledge all amendments.

Contacts

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Solicitation
Posted: May 27, 2026
Version 4
Solicitation
Posted: May 26, 2026
View
Version 3
Solicitation
Posted: May 13, 2026
View
Version 2
Solicitation
Posted: Apr 29, 2026
View
Version 1
Solicitation
Posted: Apr 20, 2026
View