CUSTER GALLATIN NATIONAL FOREST - Riley Pass Bluff B Mine Waste Excavation Project
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA, Forest Service, Custer Gallatin National Forest is soliciting quotes for the Riley Pass Bluff B Mine Waste Excavation Project. This is a 100% Small Business Set-Aside opportunity to excavate and consolidate historic mine waste in Harding County, South Dakota. The project has a firm completion date of July 1, 2026, for all non-seeding work. Quotes are due by March 3, 2026, at 4:00 PM Mountain Time.
Scope of Work
This project involves the excavation of historic mine waste (estimated 225,000 CY from Area 1 and 85,000 CY from Area 2) using GPS-controlled equipment, followed by placement and compaction in designated consolidation areas. Key tasks include site preparation, grading, roadway construction, erosion control, and turf establishment using Sterile Rye seeding. The work requires handling mine waste with specific arsenic and radium concentrations. Additionally, 10 miles of roadway reconditioning will occur on NFSR #3120, #3123, and #3130, requiring a traffic control plan as these roads remain open to public traffic.
Contract Details
- Type: Request for Quotation (RFQ), combined synopsis/solicitation.
- Contract Type: Firm Fixed Price.
- NAICS: 562910 (Remediation Services), Size Standard: 1,000 employees.
- Set-Aside: 100% Total Small Business Set-Aside.
- Bonds: A 20% Bid Bond/Offer Guarantee is required if the quote exceeds $150,000. Performance and Payment Bonds (100% of contract price) are required if the contract value exceeds $150,000, due 10 days after award. Payment protections (irrevocable letter of credit or payment bond) are required for contracts between $35,000 and $150,000.
- Period of Performance: All non-seeding work must be completed by July 1, 2026. Seeding must occur prior to June 15, 2026, or between September 15 – October 15, 2026. The period of performance will not be altered.
- Working Hours: Night work is not permitted. Weekend and holiday work requires prior approval from the Contracting Officer (CO) for special circumstances.
- Place of Performance: North Cave Hills land unit of the Custer-Gallatin National Forest, Harding County, South Dakota.
Submission & Evaluation
- Quote Due: March 3, 2026, 4:00 PM Mountain Time.
- Questions Due: February 23, 2026, 12:00 PM Mountain Time.
- Submission Requirements: Quotations must include a Schedule of Items, a document demonstrating recent and relevant experience and past performance (narrative limited to 10 pages), a bid guarantee (if applicable), and acknowledgment of all amendments. A roster of all workers and current HAZWOPER certificates is also required.
- Evaluation Criteria: Award will be based on the best value to the Government, considering Experience and Past Performance (relevancy, size, complexity, type, recency, and quality) using a comparative methodology.
Additional Notes
This is a new project. Contractors are responsible for providing water for dust control, obtaining written permission for water sources, and adhering to all regulations; visible dust is unacceptable. Prevailing wage rates (Davis-Bacon Act) apply. Site access keys will be provided post-award, though walking access is permitted during the advertisement period. Coordination with the CO for an archaeologist must be requested 14 days in advance.