FCI Oxford Install Water Softener

SOL #: 15BBNF26Q00000039Combined Synopsis/Solicitation

Overview

Buyer

Justice
Federal Prison System / Bureau Of Prisons
FAO
GRAND PRAIRIE, TX, 75051, United States

Place of Performance

Oxford, WI

NAICS

Water Supply and Irrigation Systems (221310)

PSC

Repair Or Alteration Of Penal Facilities (Z2FF)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 10, 2026
2
Last Updated
Mar 12, 2026
3
Submission Deadline
Apr 2, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Bureau of Prisons (FBOP), Department of Justice, is soliciting proposals for the installation of a new centralized water softener system at the Federal Correctional Institution (FCI) Oxford, Wisconsin. This project involves removing existing water softeners and installing a commercial-grade system to improve water quality and protect plumbing infrastructure. This is a Firm Fixed Price contract with an estimated value between $250,000 and $500,000. Proposals are due April 2, 2026, at 4:00 PM ET.

Scope of Work

The contractor will be responsible for the complete removal and disposal of existing water softeners, followed by the procurement and installation of a new centralized water softener system. Key specifications for the new system include:

  • Three 48"x72" fiberglass tanks.
  • 120 cubic feet of high-capacity cation resin (40 cu ft per tank).
  • Specific sub-fill amounts (600 lbs ¼" x 1/8", 400 lbs #20 sub-fill per tank).
  • Three Fleck 3900 control valves with NXT 2 Controls.
  • Three 3" Clack stainless steel flow meters with electronic pickup. The system must be set up as a progressive flow system and adhere to all Federal, National, and local guidelines, codes, and regulations, including manufacturer specifications. The new system must not impact the wastewater treatment plant. The Statement of Work (SOW) also outlines requirements for quality assurance, testing (including 12 monthly on-site water quality tests post-installation), housekeeping, material disposal, and submittals.

Contract & Timeline

  • Contract Type: Firm Fixed Price
  • Estimated Value: $250,000.00 - $500,000.00
  • Set-Aside: 100% Women-Owned Small Business (WOSB)
  • Proposal Due: April 2, 2026, 4:00 PM ET
  • Published Date: March 10, 2026
  • Pre-bid Site Visit: March 18, 2026, 9:00 AM at the Front Lobby of FCI Oxford.

Submission & Evaluation

Offerors must submit three items via email to rcalandra@bop.gov:

  1. SF1442 (solicitation) with specific blocks filled.
  2. SF24 Bid Bond (scanned with visible seal).
  3. A summary of the technical process for completing the work, per the Statement of Work. The acquisition will be evaluated using the Lowest Price Technically Acceptable (LPTA) source selection process. Bidders must consult the provided Wage Determination (WI20260015) for accurate labor cost estimation and compliance.

Additional Notes

Work hours are typically 7:00 AM - 3:00 PM, Monday-Friday. Contractors must adhere to strict security clearance procedures, tool inventory, and facility restrictions (e.g., no firearms, electronics, specific dress code). FBOP will provide water and 120-volt circuits; the contractor is responsible for all other equipment and materials. For questions, contact Ronald Calandra at rcalandra@bop.gov or 843-3287-9424. For site visit information, email lee-facilities-s@bop.gov.

People

Points of Contact

ronald calandraPRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Mar 12, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
View
Version 1Viewing
Combined Synopsis/Solicitation
Posted: Mar 10, 2026
FCI Oxford Install Water Softener | GovScope