FCI Oxford Install Water Softener

SOL #: 15BBNF26Q00000039Combined Synopsis/Solicitation

Overview

Buyer

Justice
Federal Prison System / Bureau Of Prisons
FAO
GRAND PRAIRIE, TX, 75051, United States

Place of Performance

Oxford, WI

NAICS

Water Supply and Irrigation Systems (221310)

PSC

Repair Or Alteration Of Penal Facilities (Z2FF)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 10, 2026
2
Last Updated
Mar 12, 2026
3
Submission Deadline
Apr 2, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Bureau of Prisons (FBOP), specifically FCI Oxford in Oxford, WI, is soliciting proposals for the removal of existing water softeners and installation of a new centralized water softener system for the entire institution. This is a 100% Women-Owned Small Business (WOSB) Set-Aside with an estimated value between $250,000 and $500,000. Proposals are due by April 2, 2026, at 4:00 PM ET.

Scope of Work

The contractor will be responsible for all necessary equipment, labor, materials, and incidentals to:

  • Remove and dispose of existing water softeners.
  • Replace piping to create a bypass around former locations.
  • Procure and install a new commercial-grade centralized water softener system.
  • The system must be sized for the facility's domestic water demand and hardness removal, including specific components like 3x 48"x72" fiberglass tanks, 120 cu ft of high-capacity cation resin, Fleck 3900 control valves, and Clack stainless steel flow meters.
  • The system will be set up as a progressive flow system and must not affect the wastewater treatment plant.
  • Installation must adhere to all Federal, National, and local guidelines, codes, and manufacturer specifications. A 5-year service option is implied.

Contract Details & Key Dates

  • Contract Type: Firm Fixed Price.
  • Estimated Value: $250,000.00 - $500,000.00.
  • Set-Aside: 100% Women-Owned Small Business (WOSB).
  • Proposal Due Date: April 2, 2026, 4:00 PM ET.
  • Submission Method: Email to rcalandra@bop.gov.
  • Pre-bid Site Visit: March 18, 2026, 9:00 AM at the Front Lobby of FCI Oxford.

Submission & Evaluation

Offerors must submit a completed SF1442, an SF24 Bid Bond (with visible seal), and a summary of the technical process for completing the work as per the Statement of Work. The acquisition will be evaluated using a Lowest Price Technically Acceptable (LPTA) source selection process. Missing items will result in an unresponsive offer.

Special Requirements & Notes

The Statement of Work details specific requirements including:

  • FBOP will provide water and 120-volt circuits; the contractor provides all other resources.
  • Adherence to various codes and regulations (seismic, environmental, Life Safety, NFPA, ADA-ABA).
  • A detailed acceptance procedure and twelve (12) monthly on-site water quality tests post-installation are required.
  • Strict security clearance procedures, daily employee checks, and specific rules for work hours (7:00 AM - 3:00 PM, M-F), material delivery/storage, tool inventory, PPE, and prohibited items within the correctional facility.
  • Attachment 2, Wage Determination WI20260015, outlines prevailing wage rates for labor.

Contact Information

For questions, contact Ronald Calandra at rcalandra@bop.gov. For site visit information, email lee-facilities-s@bop.gov.

People

Points of Contact

ronald calandraPRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Mar 12, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Mar 10, 2026
View
FCI Oxford Install Water Softener | GovScope