FCI Oxford Install Water Softener
SOL #: 15BBNF26Q00000039Combined Synopsis/Solicitation
Overview
Buyer
Justice
Federal Prison System / Bureau Of Prisons
FAO
GRAND PRAIRIE, TX, 75051, United States
Place of Performance
Oxford, WI
NAICS
Water Supply and Irrigation Systems (221310)
PSC
Repair Or Alteration Of Penal Facilities (Z2FF)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Mar 10, 2026
2
Last Updated
Mar 12, 2026
3
Submission Deadline
Apr 2, 2026, 8:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Bureau of Prisons (FBOP), specifically the Federal Correctional Institution (FCI) Oxford in Wisconsin, is soliciting proposals for the installation of a new centralized water softener system. This project involves removing existing water softeners and installing a commercial-grade system for the entire institution. This acquisition is designated as a Total Small Business Set-Aside. Offers are due by April 2, 2026.
Scope of Work
- Removal and Disposal: Remove and properly dispose of existing water softeners.
- Installation: Procure and install a new commercial-grade centralized water softener system. The system must be sized to meet the facility's domestic water demand and hardness removal requirements.
- Specific Equipment: Includes three 48"x72" fiberglass tanks, 120 cu ft of high-capacity cation resin (40 cu ft per tank), 600 lbs ¼" x 1/8" and 400 lbs #20 sub-fill per tank, three Fleck 3900 control valves with NXT 2 Controls, and three 3" Clack stainless steel flow meters with electronic pickup. The system will be set up as a progressive flow system.
- Compliance: Installation must adhere to all Federal, National, and local guidelines, codes, and regulations, as well as manufacturer specifications. The new system must not affect the wastewater treatment plant.
- Testing: Twelve (12) monthly on-site water quality tests by a qualified technician are required post-installation.
Contract & Timeline
- Contract Type: Firm Fixed Price.
- Estimated Value: Between $250,000.00 and $500,000.00.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Offer Due Date: April 2, 2026, at 4:00 PM ET.
- Submission Method: Email to rcalandra@bop.gov.
- Pre-bid Site Visit: March 18, 2026, at 9:00 AM, meeting at the Front Lobby of FCI Oxford, 350 Elk Avenue, Oxford, Wisconsin.
Evaluation
Award will be made using a Lowest Price Technically Acceptable (LPTA) source selection process (FAR 15.101-2). Offerors must submit:
- SF1449 (solicitation) with specific blocks (17a, 30a, 30b, 30c) completed, including Page 4 with the amount.
- SF24 Bid Bond (can be emailed; seal must be visible).
- A summary of the technical process for completing the work, in accordance with the Statement of Work.
Special Requirements & Notes
- Wage Determination: The General Decision Number WI20260015 (effective 01/02/2026) for Heavy Construction Projects in Wisconsin applies, outlining prevailing wage rates and fringe benefits.
- Security & Access: Strict security clearance procedures, daily tool inventory, specific work hours (7:00 AM - 3:00 PM, M-F), and dress code apply within the correctional facility. Restrictions on certain items (firearms, drugs, electronics) are in place.
- Contact: Ronald Calandra at rcalandra@bop.gov for questions. For site visit information, email oxf-facilities-s@bop.gov. NCIC clearances are not required for the site visit.
- Utilities: FBOP will provide water and 120-volt circuits; the contractor provides all other equipment, supplies, and materials.