Furniture
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP FLT LOG CTR YOKOSUKA, is seeking proposals for furniture installation services at Building 1651, 2nd Floor SRF building, U.S. Naval Base Sasebo, Japan. This Combined Synopsis/Solicitation requires the dismantling of existing furniture, removal, procurement, delivery, and installation of new office furniture and floor tiles. The contract is a Firm Fixed Price type, and the acquisition is UNRESTRICTED. Offers are due by February 27, 2026, at 10:00 AM.
Scope of Work
This opportunity involves a comprehensive furniture installation project. Key tasks include:
- Dismantling existing furniture and partitions.
- Removing and installing approximately 64 square meters of new floor tiles.
- Disposing of all removed partitions and floor tiles.
- Providing, fabricating, and installing a range of new furniture, including:
- Six L-Shaped Desks with Under Desk Cabinets.
- Thirty Cubicle Panels with Upper Cabinets.
- One Printer Wagon.
- Three Lateral Cabinets.
- Two Tables and eight Chairs (with preferred wood-grain tables and dark chairs).
- Two Cafe Counters. All new furniture must adhere to specified dimensions and maintain a cohesive design and color scheme. The contractor must assign a Contractor Project Manager (CPM) and comply with Sasebo Naval Base safety and security regulations. The government will provide water and electricity.
Place of Performance
U.S. Naval Base Sasebo, Building 1651, 2nd Floor SRF building, Sasebo, Japan. A detailed floor plan (Attachment 1) is provided, showing a workspace area of approximately 7,300mm by 9,041mm, including six individual workstations and a central conference table.
Contract Details & Timeline
- Contract Type: Firm Fixed Price.
- Set-Aside: UNRESTRICTED.
- Delivery & Installation: To be completed within 60 days After Date of Contract (ADC).
- Payment: Will be made in Japanese Yen (JPY).
- Offer Due Date: February 27, 2026, 10:00 AM.
- Questions Due: February 20, 2026, 10:00 JST (via email).
- Site Visit: Scheduled for February 18, 2026, at 13:00 JST. Attendance must be confirmed by February 11, 2026.
- Published Date: February 4, 2026.
Evaluation Criteria
Proposals will be evaluated based on Price and Past Performance.
Contact Information
For inquiries, contact Yasuhiko Motooka at yasuhiko.motooka3.ln@us.navy.mil or 81-956-50-6827.