GAOA Iargo Springs Interpretive Site Stair and Boardwalk Renovation

SOL #: 12445526B0002Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 13
Atlanta, GA, 303092449, United States

Place of Performance

Oscoda, MI

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Other Non Building Facilities (Z2PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 27, 2026
2
Last Updated
Mar 6, 2026
3
Submission Deadline
Mar 5, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting bids for the GAOA Iargo Springs Interpretive Site Stair and Boardwalk Renovation in Oscoda, MI. This Total Small Business Set-Aside opportunity involves significant site improvements, including the removal and replacement of existing wood stairs, observation platform decking and railings, and a lower-level stairway. The estimated magnitude for the project is between $1,000,000 and $5,000,000. Bids are due March 5, 2026, at 2:00 PM Eastern.

Scope of Work

This Invitation For Bids (IFB) covers comprehensive construction services at the Iargo Springs Interpretive Site. Key tasks include:

  • Removal and replacement of the existing wood stair from the upper parking area to the lower boardwalk.
  • Removal and replacement of the upper observation platform decking and railings.
  • Removal of a stairway and landing near the dam at the lower level, with installation of a railing at the end of the remaining landing.
  • An optional bid item for select boardwalk maintenance. The project requires adherence to Davis Bacon wages and includes environmental restrictions, such as no oak tree cutting between April 15 and July 15 due to Oak Wilt fungus. The worksite features steep slopes, and a site inspection is strongly encouraged.

Contract Details

  • Contract Type: Firm Fixed Price (FFP)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 237990 (Other Heavy and Civil Engineering Construction) with a $45,000,000 size standard.
  • PSC Code: Z2PZ (Repair Or Alteration Of Other Non Building Facilities)
  • Estimated Magnitude: $1,000,000 to $5,000,000 (for all base and option items combined).
  • Period of Performance: 545 days from the Notice To Proceed (NTP), which is negotiable.
  • Place of Performance: Iargo Springs Interpretive Site, Oscoda, Iosco County, MI.

Submission & Evaluation

  • Bid Due Date: March 5, 2026, at 2:00 PM Eastern.
  • Submission Method: Bids must be emailed to debra.brinn@usda.gov and CC paul.boucher@usda.gov.
  • Required Documents: A complete bid must include Attachment 02 Schedule of Items (all items priced) and acknowledgement of any amendments.
  • Bid Bond: Required on Standard Form 24 (SF-24) for bids exceeding $150,000.00 for all base items.
  • Offer Validity: Offers must be held firm for 90 calendar days.
  • Questions: Submit questions via email to paul.boucher@usda.gov and amy.lesher@usda.gov.
  • Bid Opening: Will be held via Microsoft Teams; link and call-in number to be provided later on SAM.gov.

Additional Notes

This is a re-solicitation of a previously awarded contract with modifications. Bidders must have an active SAM.gov registration. The solicitation incorporates numerous FAR clauses by reference, accessible at www.acquisition.gov. Detailed construction plans (Attachment 04) and prevailing wage rates (Attachment 06) are provided.

People

Points of Contact

BOUCHER, PAUL APRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 11
Combined Synopsis/Solicitation
Posted: Mar 6, 2026
View
Version 10
Combined Synopsis/Solicitation
Posted: Mar 4, 2026
View
Version 9
Combined Synopsis/Solicitation
Posted: Mar 2, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: Feb 27, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Feb 26, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Feb 25, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Feb 12, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Feb 9, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Feb 2, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Jan 28, 2026
View
Version 1Viewing
Combined Synopsis/Solicitation
Posted: Jan 27, 2026