GAOA Iargo Springs Interpretive Site Stair and Boardwalk Renovation

SOL #: 12445526B0002Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 13
Atlanta, GA, 303092449, United States

Place of Performance

Oscoda, MI

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Other Non Building Facilities (Z2PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 27, 2026
2
Last Updated
Mar 6, 2026
3
Submission Deadline
Mar 5, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting bids for the GAOA Iargo Springs Interpretive Site Stair and Boardwalk Renovation project in Oscoda, MI. This is an Invitation For Bids (IFB), seeking a Firm Fixed Price (FFP) contract. The opportunity is a Total Small Business Set-Aside with an estimated magnitude between $1,000,000 and $5,000,000. Bids are due by March 5, 2026, at 2:00 P.M. Eastern.

Scope of Work

This project involves significant site improvements at the Iargo Springs Interpretive Site. Key tasks include:

  • Removal and replacement of the existing wood stair from the upper parking area to the lower boardwalk.
  • Removal and replacement of the upper observation platform decking and railings.
  • Removal of a stairway and landing near the dam at the lower level, and installation of a railing at the end of the remaining landing.
  • Optional items for select boardwalk maintenance. The worksite features areas of steep slope leading into water, and contractors are strongly encouraged to inspect the location before bidding. The applicable NAICS code is 237990 (Other Heavy and Civil Engineering Construction) with a $45,000,000 size standard.

Contract Details

  • Contract Type: Firm Fixed Price (FFP) Invitation For Bids (IFB).
  • Estimated Magnitude: Between $1,000,000 and $5,000,000.
  • Period of Performance: 545 days after the Notice To Proceed (NTP). The government believes the work can be completed in one construction season.
  • Set-Aside: Total Small Business Set-Aside.
  • Place of Performance: Iargo Springs Interpretive Site, Oscoda, Iosco County, MI 48750.

Submission & Evaluation

Bids must be emailed to debra.brinn@usda.gov and CC paul.boucher@usda.gov by the deadline. A complete bid must include the "Attachment 02 Schedule of Items" with all items priced and acknowledgement of any amendments. For bids exceeding $150,000.00 for base items, a bid bond on Standard Form 24 (SF-24) is required. Offers must remain firm for 90 calendar days. Award will be made to the lowest priced, responsible, and responsive offeror.

Key Information & Notes

  • Site Inspection: A site visit is strongly recommended due to challenging conditions. A pre-bid meeting was held on February 10, 2026.
  • Questions: Questions should be emailed to paul.boucher@usda.gov and amy.lesher@usda.gov.
  • Amendments: Several amendments have been issued, updating solicitation terms, insurance requirements, and the period of performance. The latest amendment (0004) added attachments (EGLE Permit, Soil Boring Logs) and distributed Q&A responses.
  • Q&A Clarifications: Alternate offers are permitted but require written submission to the Contracting Office at least seven days prior to bid opening. Equipment access is via sidewalks, and mini excavators/skid steers can be accommodated, with damage remediation required. The site will be closed to the public during construction, and the contractor is responsible for barricading and safety. Helical piles can be considered as an alternative to concrete footings if approved by a PE review.
  • Attachments: Key documents include the Schedule of Items, SOW and Specs, Plans, Map, Wage Rates, EGLE Permit, and Soil Boring Logs, which are crucial for understanding the project scope and requirements.

People

Points of Contact

BOUCHER, PAUL APRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 11
Combined Synopsis/Solicitation
Posted: Mar 6, 2026
View
Version 10
Combined Synopsis/Solicitation
Posted: Mar 4, 2026
View
Version 9
Combined Synopsis/Solicitation
Posted: Mar 2, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: Feb 27, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Feb 26, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Feb 25, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Feb 12, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Feb 9, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Feb 2, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Jan 28, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Jan 27, 2026
View