GAOA Iargo Springs Interpretive Site Stair and Boardwalk Renovation

SOL #: 12445526B0002Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 13
Atlanta, GA, 303092449, United States

Place of Performance

Oscoda, MI

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Other Non Building Facilities (Z2PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 27, 2026
2
Last Updated
Mar 6, 2026
3
Submission Deadline
Mar 10, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting bids for the GAOA Iargo Springs Interpretive Site Stair and Boardwalk Renovation in Oscoda, MI. This Total Small Business Set-Aside opportunity seeks a contractor to perform significant site improvements under a Firm Fixed Price (FFP) contract, estimated between $1,000,000 and $5,000,000. Bids are due by March 10, 2026, at 1:00 P.M. Eastern.

Scope of Work

The project involves comprehensive renovation of the Iargo Springs Interpretive Site. Key tasks include:

  • Removal and replacement of the existing wood stair from the upper parking area to the lower boardwalk.
  • Removal and replacement of the upper observation platform decking and railings.
  • Removal of a stairway and landing near the dam at the lower level, and installation of a new railing.
  • An optional bid item for select boardwalk maintenance. The worksite features steep slopes, and a site inspection is strongly encouraged. The site will be closed to the public during construction, with the contractor responsible for barricading and safety.

Contract Details

  • Contract Type: Firm Fixed Price (FFP)
  • Set-Aside: Total Small Business Set-Aside (NAICS 237990, $45M size standard)
  • Estimated Magnitude: Between $1,000,000 and $5,000,000
  • Period of Performance: 545 days after the Notice to Proceed (NTP). The Forest Service aims for completion within one construction season.
  • Place of Performance: Iargo Springs Interpretive Site, Oscoda, MI 48750.
  • Wage Requirements: Davis Bacon wages apply to this federal construction project.

Submission & Evaluation

  • Bid Due Date: March 10, 2026, at 1:00 P.M. Eastern.
  • Submission Method: Email bids to debra.brinn@usda.gov and CC paul.boucher@usda.gov.
  • Required Documents: A complete bid must include the priced "Attachment 02 Schedule of Items" and acknowledgement of all amendments. A bid bond (Standard Form 24) is required for base items exceeding $150,000. Bidders must also provide a project schedule and detailed submittals (e.g., Safety Plan, Quality Control Plan, Soil Erosion & Sediment Control Plan, product data, certified payroll).
  • Evaluation Criteria: Award will be made to the lowest priced, responsible, and responsive offeror. Offers must remain firm for 90 calendar days.
  • Alternate Offers: Permitted, but must be submitted in writing to the Contracting Office at least seven days prior to bid opening for review and potential approval.

Important Notes

  • Environmental restrictions prohibit cutting oak trees between April 15 and July 15 due to Oak Wilt fungus.
  • Alternative foundation systems (e.g., helical piles) or material alternatives (e.g., aluminum grating) require Professional Engineer (PE) review and stamp.
  • Buy American Act requirements apply to steel components. Copper Napthenate is the specified lumber treatment.
  • Questions should be emailed to paul.boucher@usda.gov and amy.lesher@usda.gov.

People

Points of Contact

BOUCHER, PAUL APRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 11
Combined Synopsis/Solicitation
Posted: Mar 6, 2026
View
Version 10
Combined Synopsis/Solicitation
Posted: Mar 4, 2026
View
Version 9Viewing
Combined Synopsis/Solicitation
Posted: Mar 2, 2026
Version 8
Combined Synopsis/Solicitation
Posted: Feb 27, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Feb 26, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Feb 25, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Feb 12, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Feb 9, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Feb 2, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Jan 28, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Jan 27, 2026
View