GAOA Iargo Springs Interpretive Site Stair and Boardwalk Renovation

SOL #: 12445526B0002Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 13
Atlanta, GA, 303092449, United States

Place of Performance

Oscoda, MI

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Other Non Building Facilities (Z2PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 27, 2026
2
Last Updated
Mar 6, 2026
3
Submission Deadline
Mar 5, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting bids for the GAOA Iargo Springs Interpretive Site Stair and Boardwalk Renovation project in Oscoda, MI. This Total Small Business Set-Aside opportunity seeks a contractor to perform significant site improvements, including the removal and replacement of existing wooden stairs, observation platform decking and railings, and the installation of new railings. The estimated magnitude is between $1,000,000 and $5,000,000. Bids are due March 5, 2026, at 2:00 PM Eastern.

Scope of Work

The project involves comprehensive renovation at the Iargo Springs Interpretive Site. Key tasks include:

  • Removal and replacement of the existing wood stair from the upper parking area to the lower boardwalk.
  • Removal and replacement of the upper observation platform decking and railings.
  • Removal of a stairway and landing near the dam at the lower level, and installation of a railing at the end of the remaining landing.
  • An optional bid item for select boardwalk maintenance. The worksite features steep slopes, and a site inspection is strongly encouraged. The site will be closed to the public during construction, with the contractor responsible for barricading.

Contract Details

  • Contract Type: Firm Fixed Price (FFP) Invitation For Bids (IFB).
  • Set-Aside: Total Small Business Set-Aside.
  • NAICS: 237990 (Other Heavy and Civil Engineering Construction) with a $45,000,000 size standard.
  • Period of Performance: 545 days after the Notice to Proceed (NTP). The Forest Service aims for completion within one construction season.
  • Wage Requirements: Davis Bacon wages apply.
  • Materials: Buy American Act requirements apply to steel components. Copper Napthenate is the specified lumber treatment. Alternative foundation systems (e.g., helical piles) require Professional Engineer (PE) review and stamp.

Submission & Evaluation

  • Bid Submission: Bids must be emailed to debra.brinn@usda.gov and CC paul.boucher@usda.gov by March 5, 2026, at 2:00 PM Eastern.
  • Required Documents: A complete bid must include the priced "Attachment 02 Schedule of Items" and acknowledgement of all amendments. A project schedule is also required.
  • Bid Bond: For bids with a subtotal for base items exceeding $150,000.00, a bid bond on Standard Form 24 (SF-24) is mandatory.
  • Alternate Offers: Permitted, but must be submitted in writing to the Contracting Office at least seven (7) days prior to bid opening, including a complete description for review and potential approval.
  • Award Basis: Award will be made to the lowest priced, responsible, and responsive offeror. Offerors must hold prices firm for 90 calendar days.

Additional Notes

A pre-bid meeting and site visit were held on February 10, 2026. Environmental restrictions prohibit cutting oak trees between April 15 and July 15 due to Oak Wilt. Soil boring logs and an EGLE permit are available for review.

People

Points of Contact

BOUCHER, PAUL APRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 11
Combined Synopsis/Solicitation
Posted: Mar 6, 2026
View
Version 10
Combined Synopsis/Solicitation
Posted: Mar 4, 2026
View
Version 9
Combined Synopsis/Solicitation
Posted: Mar 2, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: Feb 27, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Feb 26, 2026
View
Version 6Viewing
Combined Synopsis/Solicitation
Posted: Feb 25, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Feb 12, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Feb 9, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Feb 2, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Jan 28, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Jan 27, 2026
View
GAOA Iargo Springs Interpretive Site Stair and Boardwalk Renovation | GovScope