IRS Memphis, TN Design/Build Replacement of Roofs, Electrical Breakers and Fire Alarm System Construction Project

SOL #: 47PE0325R0007Combined Synopsis/Solicitation

Overview

Buyer

General Services Administration
Public Buildings Service
PBS R4 (AMD) ACQUISITION MGMT DIVISION
ATLANTA, GA, 30303, United States

Place of Performance

Memphis, TN

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Office Buildings (Z2AA)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 3, 2025
2
Last Updated
Feb 17, 2026
3
Submission Deadline
Feb 27, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The General Services Administration (GSA), Public Buildings Service, is soliciting proposals for a Design/Build Construction Project at the IRS Customer Service Center Campus in Memphis, TN. This project involves the replacement of roofs, electrical breakers, and the fire alarm system. The estimated magnitude of construction is between $20M - $25M. Proposals are due by February 27, 2026, at 4:00 p.m. EST.

Scope of Work

The project utilizes a Design/Build approach to address critical infrastructure needs:

  • Roof Cover Replacement and Improvement: Design, repair, and replacement of thermal and moisture protection systems and rainwater drainage for roofs, covering up to 618,000 square feet. Requires a 20-year, No-Dollar-Limit (NDL) warranty, including wind riders up to 140 mph, and a web-camera surveillance system for monitoring.
  • Electrical Breaker Repairs: Replacement of twenty-six (26) failed Westinghouse POW-R-100 circuit breakers, including purchasing new units and reconditioning existing spares. A one-year warranty is required on all replaced breakers.
  • Fire Alarm System Replacement: Complete replacement of the existing fire alarm system, including all control panels, initiating/notification devices, and wiring. The new system must be an emergency voice evacuation system and both the system and installing contractor must be UL Certified.
  • Common Requirements: Includes construction and demolition (C&D) waste diversion plans and compliance with applicable codes and standards. An optional work item for additional roof repair/replacement is also included.

Contract & Timeline

  • Contract Type: Firm Fixed-Price Design-Build.
  • Estimated Value: $20M - $25M.
  • Period of Performance: 1095 calendar days from Notice to Proceed for core work items, with an additional 180 days if Option 1 is awarded. Substantial Completion is required within 810 calendar days from NTP.
  • Bonding: A $30 Million bonding requirement applies, with a bid guarantee of 20% of the bid price or $3,000,000, whichever is less.
  • Set-Aside: No specific set-aside is stated; however, a Small Business Subcontracting Plan is required, and FAR clauses related to small business subcontracting apply.
  • Liquidated Damages: $184.00 per calendar day for failure to achieve Substantial Completion.

Evaluation Factors

Award will be based on the best value to the Government. Non-price factors, when combined, are significantly more important than cost or Total Evaluated Price. Key evaluation factors include:

  1. Prior Experience & Past Performance: On similar projects (3-5 projects >$20M, >100K GSF, Design/Build or integrated delivery, multiple labor categories, not residential/retail/warehouse/industrial).
  2. Project Management Approach.
  3. Qualifications and Experience of Key Personnel: Including a registered architect/licensed PE for roofing, licensed PE for electrical, and licensed FPE for fire alarm, with a minimum of ten (10) years of general construction experience.

Submission Requirements

  • Proposal Due Date: February 27, 2026, at 4:00 p.m. EST.
  • Submission Method: Proposals must be submitted electronically as a PDF, limited to 50 pages. Offers must remain valid for at least 90 calendar days.
  • Required Documents: Includes a Past Performance Reference Questionnaire and a Contractor Pricing Template.
  • Eligibility: Offerors must have an "Active" SAM registration. Subcontractors performing roof installation, electrical breaker installation, and fire alarm installation must hold appropriate State of Tennessee certifications.
  • Security: All personnel require background checks and compliance with HSPD12 requirements.

Key Dates & Contacts

People

Points of Contact

Joseph ArdoinPRIMARY
Dellice McElroySECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Combined Synopsis/Solicitation
Posted: Feb 17, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Feb 2, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Jan 20, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Jan 9, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Dec 3, 2025
View
IRS Memphis, TN Design/Build Replacement of Roofs, Electrical Breakers and Fire Alarm System Construction Project | GovScope