- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force (377 MSG/PK) is soliciting bids for IT Infrastructure for Former DOE Buildings at Kirtland Air Force Base, New Mexico. This project involves the removal of existing telecommunications infrastructure and its replacement with new CAT6 cabling and associated equipment to establish DoD network connectivity for former Department of Energy buildings. This is a Total Small Business Set-Aside with an anticipated magnitude between $500,000 and $1,000,000. Bids are due by February 9, 2026, at 12:00 PM Mountain Daylight Time.
Scope of Work
The contractor will be responsible for comprehensive IT infrastructure upgrades. Key tasks include:
- Removal & Replacement: Tracing, cleanup, and removal of all existing telecommunications cables, patch panels, and network drops. These will be replaced with CAT6 cabling and equipment to meet KAFB Communications Standards, specifically in buildings 20386 and 20389.
- Outside Infrastructure: Installation of outside conduit, 144 Strand Single Mode Fiber Optic cabling, and multicell fabric innerduct to establish network connectivity for seven former DOE buildings (20380, 20386, 20388, 20389, 20391, 20392, 20393, and 20449). Conduit installation may involve open trenching or directional boring, with concrete encasement required for duct banks under parking lots and roads.
- Internal Infrastructure: Installation and population of vertical cable raceways/poles (for communications only, no power required), lockable network equipment cabinets (minimum 30" depth, 24" width), and Power Distribution Units (PDUs). Existing cable routing equipment can be reused or supplemented.
- Equipment Provision: The contractor will purchase and deliver network switch equipment (e.g., Catalyst 9300 series), though configuration and installation will be performed by 377 MSG/SC.
- Site Restoration: All disturbed grounds must be restored to their original condition or better, primarily involving concrete, dirt, and rocks (sod not anticipated).
- Standards & Testing: All work must conform to Kirtland Air Force Base Comm Division Specs, ANSI/TIA/EIA 607, MIL Standard 188-124B, and NFPA 70. Labeling of terminating ends per KAFB Comm Standards and testing of all installed cabling are required for final acceptance.
Contract Details
- Contract Type: Firm Fixed Price.
- Period of Performance: 365 calendar days from contract award.
- Magnitude: Between $500,000 and $1,000,000.
- Bonds: Performance and Payment Bonds are required. An Offer Guarantee is also required.
- NAICS Code: 238210 - "Electrical Contractors and Other Wiring Installation Contractors" (Size Standard: $19,000,000 Annual receipts).
- PSC Code: N059 - "Installation Of Equipment: Electrical And Electronic Equipment Components".
Set-Aside & Eligibility
This is a Total Small Business Set-Aside (FAR 19.5). Bidders must be registered and "Active" in SAM.gov.
Submission & Evaluation
- Proposal Submission: Bids must be submitted electronically via email to the Contracting Officer by February 9, 2026, at 12:00 PM Mountain Daylight Time.
- Bid Opening: February 9, 2026, at 1:00 PM Mountain Daylight Time at 377 MSG/PKC Conference room (RM 126), Kirtland AFB.
- Evaluation: Award will be made to the lowest responsive and responsible bidder, considering only price. Progress payments will be utilized based on percentage of work completed.
Key Dates & Notes
- Site Visit: A site visit was held on January 16, 2026.
- Questions Due: Questions were due by January 23, 2025.
- Wage Determination: Bidders must adhere to the prevailing wage rates and fringe benefits outlined in Wage Determination NM20250044 for Bernalillo County, New Mexico.
- Technical Specifications: Compliance with the "Kirtland AFB Communications Specifications May 2025" document is mandatory.