JFY 2022 PROJECT J-875, BATTLE STAFF TRAINING FACILITY, U.S. NAVSUPPACT MCB CAMP BLAZ, GUAM
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVFACSYSCOM PACIFIC, is soliciting proposals for the JFY 2022 Project J-875, Battle Staff Training Facility, at U.S. NAVSUPPACT MCB Camp Blaz, Guam. This unrestricted design-bid-build (DBB) construction project is estimated between $25,000,000 and $100,000,000. Proposals are due July 7, 2026, at 2:00 p.m. Hawaii Standard Time (HST).
Scope of Work
This project involves the construction of a two-story Battle Staff Training Facility (BSTF) for the Third Marine Expeditionary Brigade Marine Air-Ground Task Force (MAGTF). The work includes:
- Base Item (CLIN 0001AA): Entire facility construction, featuring reinforced concrete foundation, exterior walls, flooring, windows, roofing, mechanical, electrical, emergency power, and information systems designed for Guam's seismic and environmental conditions.
- Base Item (CLIN 0001AB & 0001AC): Removal of unsatisfactory soil and installation of Cement Deep Soil Mixing (CDSM) for ground improvements.
- Option Item 1 (CLIN 0002): Pavilion construction with site development and utilities.
- Option Item 2 (CLIN 0003): Standby Back-up Generator, Generator Building, Fuel Storage Yard, and Sand Filter, including site development and utilities.
- Planned Modification (CLIN 0004AA & 0004AB): Furniture, Fixtures and Equipment (FF&E), Specialty Collateral Equipment (CEQ), and Handling and Administrative Rate (HAR). Support facilities include utilities, site improvements, emergency generator, access roads, and parking.
Contract Details & Timeline
- Contract Type: Firm-fixed price.
- Period of Performance: Completion within 1157 calendar days after notice to proceed.
- Estimated Value: $25,000,000 - $100,000,000.
- Set-Aside: Unrestricted. A Small Business Subcontracting Plan is required for large businesses.
- Proposal Due Date: July 7, 2026, 2:00 p.m. HST.
- Site Visit: A pre-proposal site visit was held on May 19, 2026.
- Submission Method: Multiple hard-copy volumes with accompanying electronic submission on CD.
Evaluation Criteria
Award will be based on the lowest evaluated price among proposals meeting acceptability standards for technical evaluation factors. An "ACCEPTABLE" rating is required in all technical factors, which include Experience, Past Performance, and Safety.
Key Requirements & Clarifications
- Technical Specifications: The project adheres to Unified Facilities Criteria (UFC) and includes strict cybersecurity requirements for facility-related control systems (FRCS) per NIST SP 800-82 and DODI 8500.01.
- Brand-Name Components: Specific brand-name components are required for certain systems, including Johnson Controls Incorporated (JCI) METASYS Building Automation System, Schneider Electric PowerLogic ION8650-B meters, Federal Signal Mass Notification Remote Terminal Units, Kaba-Mas X-10 locks, Elevator Controls Corporation (ECC) elevator control systems, Knox Box products, and King-Fisher fire alarm radio transmitters, to ensure standardization and interoperability with existing base infrastructure.
- Amendments & Q&A: The solicitation has undergone several amendments and Q&A clarifications. Notably, the bid submission deadline has been extended multiple times, most recently to July 7, 2026. Clarifications have also been provided regarding geotechnical specialist qualifications, cable tray installation, and the absence of a smoke control system. Future amendments are expected to address MEC/UXO requirements and the deletion of epoxy-coated reinforcement requirements.
- Soilcrete: No alternative to the 4' soilcrete column will be allowed.