LAN HVAC Replacement

SOL #: FY261222006Combined Synopsis/Solicitation

Overview

Buyer

State
International Boundary And Water Commission: Us Mexico
INTERNAT. BOUNDARY AND WATER COMM.
El Paso, TX, 79902, United States

Place of Performance

El Paso, TX

NAICS

Plumbing (238220)

PSC

Installation Of Equipment: Refrigeration, Air Conditioning, And Air Circulating Equipment (N041)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 18, 2026
2
Last Updated
May 2, 2026
3
Submission Deadline
May 6, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The International Boundary and Water Commission, United States Section (IBWC) is seeking quotes for LAN HVAC Replacement services at its Headquarters in El Paso, TX. This is a 100% Small Business Set-Aside opportunity. The requirement involves replacing an existing air-cooled Leibert HVAC system with a new 23 kW system and integrating it with the existing Carrier HVAC system. Quotes are due by May 6, 2026, at 3:00 PM MST.

Scope of Work

The contractor will be responsible for furnishing all labor, materials, equipment, and services to remove the existing air-cooled Leibert HVAC system and install a new Liebert PDX Air-Cooled System (or equivalent) with a remote condensing unit. Key tasks include:

  • Providing and installing a motorized damper system for switching cooling air between the new Liebert unit and the existing Carrier HVAC system, integrated with the HVAC control system.
  • Providing crane service for both removal and installation of equipment.
  • Removing and disposing of old equipment in compliance with EPA regulations and FAR Part 23.
  • Installing all required refrigeration piping, compatible with R-410A or an alternative compliant refrigerant.
  • Reconnecting new equipment to the existing electrical infrastructure.
  • Performing full startup and commissioning, including logging operating temperatures and pressures.

Key Requirements & Site Details

The required cooling capacity is 23 kW, correcting a previous clerical error that stated "23 tons." Equivalent alternatives to the Liebert brand are acceptable, provided they meet or exceed technical specifications, demonstrate compatibility, include supporting documentation, and are submitted for agency technical review. Performance standards include a minimum EER of 10.0, 460V, 3-phase, 60Hz, and digital microprocessor-based controls with remote monitoring. Site details include:

  • The server room is on the second floor, accessible by elevator (4000 lbs capacity, 4ft W, 6.5ft L, 7.3ft H).
  • The evaporator unit in the server room has 3ft door access to the hallway.
  • The condenser is on the third-floor roof, requiring crane access from the SW corner of the building.
  • The electrical panel for the Liebert unit is Panel H1, Circuit 20,22,24 480volts, located in the 1st-floor supply room. Existing line sets are operational and in use.

Contract Details & Set-Aside

This is a combined synopsis/solicitation (RFQ) issued under solicitation number FY261222006. It is a 100% Small Business Set-Aside under NAICS code 238220 – Plumbing, Heating, and Air-Conditioning Contractors (size standard $19.0 Million) and PSC N041 – Installation of Equipment-Refrigeration, Air Conditioning, and Air Circulating Equipment. Services must be quoted on an ALL or NONE basis per the CLIN structure and SOW. Quotes must be valid for 90 days.

Evaluation Criteria

Award will be made to the Lowest Price Technically Acceptable (LPTA), responsible offeror. Evaluation factors include:

  • Technical acceptability to meet IBWC requirements.
  • Technical Approach: A narrative addressing all SOW items, including plan of action, equipment, key team members, and schedule.
  • Past Performance: At least three references for similar projects, including contact information and a brief project description.

Submission Requirements & Deadlines

Offerors must include an active UEI and a completed copy of FAR provision 52.212-3 (or paragraph (b) if registered in SAM). Questions must be submitted via email to angelica.baca@ibwc.gov by May 1, 2026, at 3:00 PM MST. Quotes are due by email to angelica.baca@ibwc.gov by May 6, 2026, at 3:00 PM MST.

Attachments

Key attachments include the CLIN Structure, Clauses and Provisions, and the updated Scope of Work.

People

Points of Contact

Angelica BacaPRIMARY
Seone Michael JonesSECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: May 2, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: May 1, 2026
View
Version 7Viewing
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
Version 6
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Apr 26, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 22, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 18, 2026
View