LOLO NATIONAL FOREST - Ninemile Water & Wastewater and St. Regis Wastewater Improvements
SOL #: 1240LU26Q0010Combined Synopsis/Solicitation
Overview
Buyer
Agriculture
Forest Service
LOLO NATIONAL FOREST
MISSOULA, MT, 59804, United States
Place of Performance
MT
NAICS
Water and Sewer Line and Related Structures Construction (237110)
PSC
Repair Or Alteration Of Water Supply Facilities (Z2NE)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Jan 27, 2026
2
Last Updated
Mar 5, 2026
3
Submission Deadline
Mar 6, 2026, 7:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Lolo National Forest is soliciting quotations for Ninemile Water & Wastewater and St. Regis Wastewater Improvements under a Firm Fixed-Price contract. This 100% Total Small Business Set-Aside opportunity involves replacing water and wastewater systems at the Ninemile Ranger Station and the wastewater system at the St. Regis Work Center in Montana. Quotations are due by March 6, 2026, at 12:00 PM Mountain Time.
Scope of Work
This Request for Quotation (RFQ) covers comprehensive infrastructure upgrades:
- Ninemile Ranger Station: Replacement of the entire water distribution system and wastewater collection system, including one potential option item. Detailed technical specifications and construction plans are provided.
- St. Regis Work Center: Replacement of the wastewater collection system, including new sewer mains, manholes, service connections, and a new wastewater treatment system with septic tank and pressure-dosed drainfield. Crucially, the water system at St. Regis is explicitly excluded from this contract and will be advertised separately.
Contract Details
- Contract Type: Firm Fixed-Price.
- NAICS Code: 237110 (Water and Sewer Line and Related Structures Construction), with a $45.0M size standard.
- Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5).
- Period of Performance: Work must be completed by October 1, 2027.
- Bonds:
- Bid Bond/Offer Guarantee: 20% required for quotes exceeding $150,000, using SF 24.
- Performance & Payment Bonds: 100% of original contract price required for contracts over $150,000, due 10 days post-award.
- Payment Protections: Required for contracts between $35,000 and $150,000 (irrevocable letter of credit or payment bond), due 10 days post-award.
- Prevailing Wages: Applicable General Decision Numbers (GDN) for heavy construction in Missoula, Lake, Lincoln, Mineral, Ravalli, and Sanders counties, Montana, are provided and must be adhered to.
Submission & Evaluation
- Quote Due Date: March 6, 2026, by 12:00 PM Mountain Time.
- Submission: Email quotes to Alisha Knaub at alisha.knaub@usda.gov.
- Evaluation: Quotes will be evaluated using a comparative methodology for best value, not solely lowest price. Key factors include:
- Experience: Demonstrated relevant experience in scope, size, and complexity.
- Past Performance: Narrative of five (5) relevant contracts within the last five years.
- Price: Total price evaluation will consider base and option items, including quantity and prompt payment discounts.
- Required Submittals: Bidders must submit a document demonstrating recent and relevant experience and past performance (see pages 12-14 of the Terms and Conditions).
Key Updates & Notes
- This is a combined synopsis/solicitation; no separate written solicitation will be issued.
- Amendment 003 (2/24/2026) extended the quote due date to March 6, 2026, and set February 27, 2026, as the final day for questions.
- Amendment 001 (2/9/2026) announced a formal site visit for the Ninemile Ranger District on February 18, 2026. No site visit was planned for St. Regis.
- Amendment 002 (2/18/2026) added FAR clause 52.246-21, "Warranty of Construction."
- Questions & Answers (2/18/2026) clarified that there are no liquidated damages or Disadvantaged Business Enterprise (DBE) requirements. Work systems must remain functional throughout the contract.
People
Points of Contact
Alisha KnaubPRIMARY
Files
Versions
Version 6
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Feb 25, 2026
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Feb 24, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Feb 18, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Feb 9, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Jan 27, 2026