Modular Wall Kit

SOL #: FA462026QA206Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4620 92 CONS LGC
FAIRCHILD AFB, WA, 99011-5320, United States

Place of Performance

Fairchild Air Force Base, WA

NAICS

Prefabricated Metal Building and Component Manufacturing (332311)

PSC

Prefabricated And Portable Buildings (5410)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 29, 2026
2
Last Updated
Feb 20, 2026
3
Submission Deadline
Feb 26, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force (DEPT OF DEFENSE), specifically the 92 CONS LGC office at Fairchild Air Force Base, WA, has issued a combined synopsis/solicitation for a Modular Wall Kit. This acquisition is a 100% Small Business Set-Aside and seeks to procure modular, reconfigurable walls for a dedicated escape training laboratory for SERE students. Quotes are due by February 26, 2026, at 10:00 AM PT.

Scope of Work

The contractor shall provide one (1) Modular Wall Kit in accordance with the attached "Salient Characteristics." Key requirements include:

  • Modularity: Walls must be reconfigurable for various layouts and scenarios.
  • Portability: Easy to assemble, disassemble, and transport by two people without additional equipment.
  • Panel Construction: Approximately 85 light-weight wall panels (4' x 7-10'), 8-15 doors (half inward/outward opening), and 4-12 non-opening windows.
  • Frame Construction: Lightweight vertical uprights, horizontal stabilizer bars, and connectors.
  • Size: Minimum 1,800 sq/ft to a maximum of 2,500 sq/ft.
  • Usage: Primarily for indoor use, but suitable for outdoor use.
  • Shipping: All shipping costs to Fairchild AFB, WA, must be included.

Contract & Timeline

  • Contract Type: Firm-Fixed-Price (FFP) contract.
  • FOB: Destination, with inspection and acceptance at the destination.
  • Purchase Order: The Government intends to issue a Purchase Order and does not intend to incorporate options.
  • RFQ Number: FA462026QA206.
  • Quotes Due: February 26, 2026, at 10:00 AM PT.
  • Questions Due: February 19, 2026, at 10:00 AM PT.
  • Published Date: February 12, 2026.

Eligibility & Evaluation

  • Set-Aside: This is a 100% Small Business Set-Aside.
  • NAICS Code: 332999 (All Other Miscellaneous Fabricated Metal Product Manufacturing) with a size standard of 750 employees.
  • PSC: 5410 (Prefabricated And Portable Buildings).
  • SAM Registration: All prospective offerors must be registered and active in the System for Award Management (SAM) at www.sam.gov. Lack of SAM registration will make an offeror ineligible for award.
  • Evaluation: Award will be made to the responsible vendor whose quote is most advantageous to the government, considering Price and SPRS (Supplier Performance Risk System).

Additional Notes

  • Funds Availability: Funds are not presently available for this effort; no award will be made until funds are available.
  • Government Rights: The Government reserves the right to cancel this solicitation at any time and has no obligation to reimburse offerors for costs incurred.
  • Submission: Quotes must be submitted via email to SSgt Alexis Grimes (alexis.grimes@us.af.mil) and Sarah O'Neil (sarah.oneil.1@us.af.mil). .zip files are not acceptable, and emails over 10 MB may not be received. Prices must remain firm for 30 calendar days from the quote submission date.

People

Points of Contact

Files

Files

Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Feb 20, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Feb 19, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Feb 18, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Feb 12, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Feb 12, 2026
View
Version 1
Sources Sought
Posted: Jan 29, 2026
View
Modular Wall Kit | GovScope