Office Renovations

SOL #: 12639526Q0118Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Animal And Plant Health Inspection Service
MRPBS MINNEAPOLIS MN
MINNEAPOLIS, MN, 55401, United States

Place of Performance

Corpus Christi, TX

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 23, 2026
2
Last Updated
May 13, 2026
3
Submission Deadline
May 22, 2026, 1:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Department of Agriculture (USDA) is soliciting quotes for Office Renovations at its Agriculture Marketing Service Cotton Classing Office in Corpus Christi, TX. This project involves converting storage space into offices, upgrading the reception area, improving flooring, and adding limited electrical/telecom infrastructure. This opportunity is a Total Small Business Set-Aside. Quotes are due May 22, 2026, at 8:30 AM CT.

Scope of Work

The contractor will provide all labor, materials, equipment, and supervision for renovations and office modifications. Key tasks include:

  • Front Office: Conversion of a storage area into an office, including wall repair, repainting, recarpeting, door modification, and electrical/telecom additions.
  • Reception Area: Removal of existing counter, fabrication and installation of a new solid wood and Formica counter, recarpeting, and wall extension with a new door.
  • Hallways and Break Room: Removal of existing tile and preparation/polishing of the concrete slab.
  • General Office: Installation of an acoustic sliding door (NIC 40 rated) between the General Office and the new Assistant AD office.
  • General Storage Room: Conversion into an Assistant AD office, involving shelving removal, wall repair, repainting, recarpeting, door modification, and electrical/telecom additions. All work must comply with federal, state, and local building codes, as well as USDA standards.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation (Request for Quotations - RFQ). Award will be made on Standard Form 1442.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Estimated Magnitude: $25,000 - $100,000.
  • Period of Performance: Work must commence within five calendar days after Notice to Proceed (NTP) and be completed within 60 calendar days from NTP.
  • Place of Performance: 3545 Twin River Blvd, Corpus Christi, TX 78410.
  • Bonds: A payment bond will be required within 10 days of award; a bid bond is not required.

Submission & Evaluation

  • Submission Deadline: May 22, 2026, at 8:30 AM CT.
  • Submission Package: Must include the quote page, demonstration of relevant experience, and past performance information.
  • Submission Method: Email to james.g.roloff@usda.gov.
  • Evaluation Criteria: Lowest Price Technically Acceptable (LPTA) approach. Only the lowest priced quote will be evaluated for technical acceptability; if unacceptable, the next lowest will be evaluated.
  • Questions Due: May 19, 2026, at noon CT.
  • Site Visit: Scheduled for May 5, 2026, at 10 a.m. CT.

Special Requirements & Notes

  • Wage Rates: Bidders must adhere to the Federal Construction Wage Rates for Nueces County, TX (General Decision TX20260288), which includes provisions for Executive Order 13706 (Paid Sick Leave) and Executive Order 13658 (Minimum Wage).
  • Occupancy: The facility may be fully occupied during construction; contractors should account for potential noise restrictions.
  • Telecom/Data: Existing electrical and network jacks are cream-colored; existing wiring is black.
  • Warranties: Manufacturer warranties (e.g., 15-year for carpet) and a minimum one-year contractor workmanship warranty are required.
  • USDA Exemption: USDA is exempt from sales tax.

People

Points of Contact

Files

Files

Download
Download
Download

Versions

Version 8
Combined Synopsis/Solicitation
Posted: May 13, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: May 7, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: May 6, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: May 5, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
View