Phase V Multiple BEQ Room Entry Door Lock Repairs

SOL #: N4008526R9029Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 10, 2026
2
Last Updated
May 12, 2026
3
Submission Deadline
May 12, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for Phase V Multiple BEQ Room Entry Door Lock Repairs at Camp Lejeune, NC. This project involves replacing existing locksets with new Ving Card Signature RFID electronic swipe lock systems in multiple Bachelor Enlisted Quarters (BEQ) buildings. This is a Total Small Business Set-Aside, but only M&R MACC Contractors listed on the General Requirements cover page are eligible to submit a proposal. Proposals are due May 12, 2026, at 6:00 PM EST.

Scope of Work

The contractor will replace existing locksets on living area doors in multiple BEQ buildings with new Ving Card Signature RFID electronic lock systems. This includes providing new locksets compatible with ANSI/BHMA standards, Best Locks M-Series cylinders, and high-security cylinders. The system must support interrogation of at least 600 events. The scope also requires providing a front desk system (computer, monitor, Ving Vision software, RFID encoder), spare locksets, service terminals, RFID contact cards, and a specified quantity of 1K and 4K RFID cards. A master keying system for each floor and a key cabinet are also required. The facility will remain operational throughout the 540-day performance period, requiring minimal interference with normal activities. Specific repair locations and quantities are detailed in the attached "BEQ Lock Data Sheet" as updated by Amendment 0001.

Contract Details & Timeline

  • Contract Type: Combined Synopsis/Solicitation (implies construction)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Eligibility: Restricted to M&R MACC Contractors listed on the General Requirements cover page.
  • Period of Performance: 540 days after award.
  • Estimated Cost Range: $1,000,000 to $5,000,000.
  • Proposal Due Date: May 12, 2026, 6:00 PM EST.
  • Requests for Information (RFIs) Cut-off: April 24, 2026, 3:00 PM EST.
  • Site Visit: April 16, 2026, at 1000 at HP265.
  • Published Date: April 16, 2026.

Evaluation & Requirements

Award will be based on the Lowest Price. Bidders must acknowledge Amendment 0001, which updates the Scope of Work and references the "BEQ Lock Data Sheet." Required submittals are outlined in the Submittal Register. The contractor must provide training for the new lock system and submit all lock product specifications and a detailed work schedule. Compliance with the "Contractor Environmental Guide" for MCB Camp Lejeune is mandatory, covering hazardous materials, waste disposal, and environmental protection. Bid, payment, and performance bonds are required based on proposal value.

Contacts

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 8
Combined Synopsis/Solicitation
Posted: May 12, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: May 11, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: May 11, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
View