Phase V Multiple BEQ Room Entry Door Lock Repairs
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for Phase V Multiple BEQ Room Entry Door Lock Repairs at MCB Camp Lejeune, North Carolina. This opportunity is a Total Small Business Set-Aside and is open only to M&R MACC Contractors listed on the General Requirements cover page. The project involves replacing existing lock-sets with new swipe lock systems in multiple Bachelor Enlisted Quarters (BEQ) buildings. Proposals are due May 18, 2026, at 2:00 PM EST.
Scope of Work
This project entails the replacement of existing lock-sets on living area doors with new swipe lock systems across 31 BEQ buildings at Camp Lejeune. Key requirements include:
- Installation of Ving Card Signature RFID electronic lock systems, with the basis of design being the Dormakaba RFID lock system.
- Locks must meet ANSI/BHMA A156.2 (Series 4000, Grade 1) and A156.3 (Grade 1) standards, with high-security cylinders compliant with ANSI/BHMA A156.30.
- Systems must support interrogation of at least 600 events.
- Provision of a front desk system (computer, monitor, Ving Vision software, RFID encoder), spare locksets, service terminals, and RFID contact cards.
- Supply of 1500 1K RFID resident cards and 100 4K staff cards.
- Implementation of a master keying system per floor, including master, grand master, and sub-master keys, and a key cabinet for BEQ PP2.
- Contractor responsibility for door and frame modifications due to varied existing locks.
- Contractor responsible for full operation and upgrades of network infrastructure for lock operation; laptops for each building will operate as standalone systems.
- The facility will remain occupied, requiring minimal interference with normal operations and daily securing of installation areas.
- Contractor must provide training for the new lock system and a one-year warranty with 24-hour phone support.
- One person may fill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer if qualified.
Contract Details
- Type: Combined Synopsis/Solicitation (implies a construction contract).
- Period of Performance: 540 days after award.
- Estimated Cost Range: Between $1,000,000 and $5,000,000.
- Bonds: Bid, payment, and performance bonds are required based on proposal value (for $35K and $150K+).
- Applicable Regulations: Executive Order (EO) 13706 (Paid Sick Leave) and EO 13658 (Minimum Wage) apply. Buy American Requirement-Construction Materials also applies.
- Funding: Offerors are advised that funding may not become available, and no award will be made if funds are not available.
Eligibility & Submission
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Eligibility: Only M&R MACC Contractors listed on the General Requirements cover page may submit a proposal.
- Proposal Due Date: May 18, 2026, at 2:00 PM EST.
- Submission: Proposals should be emailed to edward.e.pelser.civ@us.navy.mil and regenia.d.guest.civ@us.navy.mil.
- Point of Contact (RFIs): Sharon E. Humphrey (sharon.e.humphrey.civ@us.navy.mil, 910-451-5982).
- Evaluation: Award will be based on the Lowest Price.
- Amendment Acknowledgement: Offerors must acknowledge all amendments (0001, 0002, 0003, 0004, 0005) with their proposal; failure to do so may result in rejection.