Phase V Multiple BEQ Room Entry Door Lock Repairs

SOL #: N4008526R9029Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 10, 2026
2
Last Updated
May 12, 2026
3
Submission Deadline
May 12, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for Phase V Multiple BEQ Room Entry Door Lock Repairs at MCB Camp Lejeune, North Carolina. This project involves replacing existing lock-sets with new swipe lock systems in 31 Bachelor Enlisted Quarters (BEQ) buildings. This opportunity is a Total Small Business Set-Aside.

Scope of Work

The contractor will replace existing lock-sets on living area doors with new Ving Card Signature RFID or Dormakaba RFID electronic lock systems. This includes providing bit lists, cores, master keying systems (Grand master, Master, Sub-Master), a front desk system (computer, monitor, Ving Vision software, RFID encoder), spare locksets, service terminals, and RFID cards (1500 resident, 100 staff). The contractor is responsible for the full operation and upgrades of the network infrastructure for lock operation, as well as any necessary door and frame modifications. Training for the new lock system operation is also required. Facilities will remain occupied during construction, necessitating minimal interference with normal operations and daily security of work areas. The project has an anticipated duration of 540 days.

Contract Details

This is a Combined Synopsis/Solicitation for repair or alteration of miscellaneous buildings (PSC Z2JZ). The estimated cost range for this project is between $1,000,000 and $5,000,000. Eligibility is restricted to M&R MACC Contractors listed on the General Requirements cover page. Bid, payment, and performance bonds are required based on proposal value. Offerors must comply with the Contractor Environmental Guide for MCB Camp Lejeune.

Evaluation & Submission

Award will be based on the Lowest Price. Proposals must include pricing for 31 Exhibit Line Item Numbers (ELINs 0001-0031) as detailed in the Revised Pricing Sheet. Failure to price all ELINs may result in rejection. Offerors must acknowledge all amendments with their proposal.

Key Amendments & Updates

  • Amendment 0004 clarified the project involves 31 BEQ buildings (not 36) and designated the Dormakaba RFID lock system as the basis of design. It also confirmed contractor responsibility for network infrastructure and door modifications.
  • Amendment 0005 extended the proposal due date to May 18, 2026, at 2:00 PM EST and updated the primary point of contact to Sharon E. Humphrey.
  • Amendment 0006 provided answers to Requests for Information, including clarifications on pricing evaluation for ELINs and training requirements.

Contact Information

For inquiries, contact Sharon Humphrey at sharon.e.humphrey.civ@us.navy.mil or 910-451-5982. Secondary contact is Regenia D. Guest at regenia.d.guest.civ@us.navy.mil or 910-451-5816.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Combined Synopsis/Solicitation
Posted: May 12, 2026
View
Version 7Viewing
Combined Synopsis/Solicitation
Posted: May 11, 2026
Version 6
Combined Synopsis/Solicitation
Posted: May 11, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
View