Binghamton New York First Floor Buildout Solicitation

SOL #: 47PC5326R0002Solicitation

Overview

Buyer

General Services Administration
Public Buildings Service
PBS PROJECT DELIVERY EAST - BRANCH C
Washington, DC, 20405, United States

Place of Performance

Binghamton, NY

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Office Buildings (Z2AA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 5, 2026
2
Last Updated
Apr 29, 2026
3
Submission Deadline
May 4, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The General Services Administration (GSA), Public Buildings Service, is soliciting proposals for the Binghamton New York First Floor Buildout. This project involves the renovation of approximately 3,015 Sq. Ft. at the Binghamton Federal Building and U.S. Courthouse to create a Sensitive Compartmented Information Facility (SCIF). This opportunity is a Total Small Business Set-Aside. Proposals are due by May 4, 2026, at 4:00 PM Eastern.

Scope of Work

The project requires furnishing all materials, equipment, labor, and supervision for the 1st Floor build-out. Work includes demolition, abatement, new walls, hard ceiling, doors, casework, woodwork, flooring, plumbing, electrical, IT, fire protection, and mechanical systems. The renovated space must comply with SCIF requirements, including IAW TEMPEST/01-13. A Construction Security Plan (CSP) will be provided post-award. Clarifications from RFI responses include specific drawing updates (AE600, AE601), specification corrections (e.g., Section 081113 is not required, 224217 changed to 224216), and details on fire alarm/security system integration.

Contract Details

This is a Firm Fixed-Price construction contract. Performance is expected to commence within 10 calendar days after Notice of Award, with Substantial Completion required no later than 210 calendar days from Notice of Award, and Contract Completion within 30 calendar days of Substantial Completion. Liquidated damages of $880.61 per calendar day will apply for failure to achieve Substantial Completion on time.

Qualification & Special Requirements

  • Experience: Minimum 8 years of successful experience in comparable projects (size, complexity, scope).
  • Past Performance: Three required projects, each with a minimum award value of $1,500,000. At least one must be SCIF construction, performed as the General Contractor.
  • Key Personnel: Project Manager and Superintendent must each have a minimum of 8 years of experience in their respective positions. The company owner may not serve as the Project Manager.
  • Security: All personnel must meet HSPD-12 security requirements. Cell phones and transmittal devices are prohibited on the project site. Loud or disruptive work must be performed off-hours at no additional cost. Coordination with GSA Building Management and Security Division Access Control (SDAC) is required for building shut-offs and roof penetrations.

Submission & Evaluation

Proposals are due by May 4, 2026, at 4:00 PM Eastern. Offerors must submit a Price Proposal, Technical Proposal, Representations and Certifications, Bid Bond (SF 24), Contractor's Qualification and Financial Information (GSA Form 527), and completed forms for Experience on Similar Projects (Attachment 1) and Key Personnel Resumes (Attachment 3). Offerors must also ensure their SAM registration status is "Active." Evaluation will be based on Total Evaluated Price and non-price factors including Experience, Past Performance, and Staffing Plan.

Amendments

This solicitation has been amended multiple times. Amendment 3 provided responses to Requests for Information (RFIs), clarified drawing and specification details, and extended the proposal due date to May 4, 2026.

People

Points of Contact

James BerringPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
View

Versions

Version 8
Solicitation
Posted: Apr 29, 2026
View
Version 7Viewing
Solicitation
Posted: Apr 27, 2026
Version 6
Solicitation
Posted: Apr 27, 2026
View
Version 5
Solicitation
Posted: Apr 21, 2026
View
Version 4
Solicitation
Posted: Apr 17, 2026
View
Version 3
Solicitation
Posted: Mar 20, 2026
View
Version 2
Solicitation
Posted: Mar 19, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 5, 2026
View