Q-1075 SOF Operations Building Addition and Renovation, NAS Oceana Dam Neck Annex, Virginia Beach, Virginia

SOL #: N4008525R2663Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

VA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

No set aside specified

Timeline

1
Posted
Nov 3, 2025
2
Last Updated
Mar 10, 2026
3
Submission Deadline
Feb 18, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVFACSYSCOM MID-ATLANTIC is soliciting proposals for the Q-1075 SOF Operations Building Addition and Renovation project at Naval Air Station Oceana, Dam Neck Annex, Virginia Beach, Virginia. This opportunity, valued between $10,000,000 and $25,000,000, is issued under an existing Indefinite-Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC). Proposals are due by February 18, 2026, at 2:00 PM EST.

Scope of Work

This task order involves the construction of a two-story addition to Building 368 to expand high-bay space and add mezzanine storage. The project also includes the renovation of existing administrative and operational spaces within Building 368. Key requirements include the incorporation of cybersecurity measures for facility-related control systems, Anti-Terrorism/Force Protection (AT/FP) features, and the installation of built-in equipment such as parking lifts. Record shop drawings are required. The total construction duration is specified as 1,200 calendar days from the notice to proceed.

Contract Details

  • Contract Type: Task Order under IDIQ Multiple Award Construction Contract (MACC) (N40085-21-D-0079/0080/0081/0082/0083/0084/0085/0086)
  • Estimated Value: $10,000,000 to $25,000,000
  • Period of Performance: 1,200 calendar days
  • Eligibility: Restricted to MACC holders only
  • Product Service Code: Y1JZ (Construction Of Miscellaneous Buildings)
  • Wage Determination: Department of Labor General Decision Number VA20250167 applies.

Submission & Evaluation

Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module in PDF format. A Bid Guarantee is required, equal to at least 20 percent of the offer price or $3,000,000, whichever is less. Award will be made on a fair opportunity basis to the responsible offeror providing the best value to the Government, determined by evaluating price only. The proposal acceptance period is 120 calendar days from the deadline.

Key Updates & Deadlines

  • Proposal Due Date: February 18, 2026, at 2:00 PM EST. This date was extended by Amendment 0005, which also provided responses to Pre-Proposal Inquiries (PPIs).
  • Pre-Proposal Inquiries (PPIs): The submission deadline for PPIs was December 17, 2025. Amendment 0001 outlined that PPIs must be submitted in writing via email to Demetrice Jenkins (CC Catharine Keeling) using the PPI form (Attachment C).
  • Amendments: Multiple amendments have been issued, updating the proposal due date, providing PPI responses, revising drawings (Electrical and Interior), updating specifications (Work Restrictions, Administrative Requirements, Firestopping), and providing a Site Visit Log. Bidders must review all amendments and acknowledge them in their proposals.

Contact Information

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 11
Solicitation
Posted: Mar 10, 2026
View
Version 10
Solicitation
Posted: Feb 26, 2026
View
Version 9
Solicitation
Posted: Feb 12, 2026
View
Version 8
Solicitation
Posted: Jan 29, 2026
View
Version 7Viewing
Solicitation
Posted: Jan 29, 2026
Version 6
Solicitation
Posted: Jan 9, 2026
View
Version 5
Solicitation
Posted: Dec 11, 2025
View
Version 4
Solicitation
Posted: Dec 11, 2025
View
Version 3
Solicitation
Posted: Nov 18, 2025
View
Version 2
Solicitation
Posted: Nov 5, 2025
View
Version 1
Solicitation
Posted: Nov 3, 2025
View