Removal of Topsail Beach Pier

SOL #: W912PM26QA023Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W074 ENDIST WILMINGTON
WILMINGTON, NC, 28403-1343, United States

Place of Performance

Surf City, NC

NAICS

Site Preparation Contractors (238910)

PSC

Site Preparation (F021)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 2, 2026
2
Last Updated
Mar 16, 2026
3
Submission Deadline
Mar 23, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, USACE Wilmington District, is soliciting quotes for the removal and disposal of the Topsail Beach Pier remains, including pilings and debris, at Topsail Beach, NC. This is a 100% Small Business Set-Aside opportunity with an estimated value between $50,000.00 and $100,000.00. Award will be made to the Lowest Priced, Technically Acceptable offer. Quotes are due by March 23, 2026, at 2:00 PM ET.

Scope of Work

The contractor will be responsible for the complete removal and off-site disposal of up to 36 pilings (up to 12 inches in diameter), pier bracing, crossmembers, and any associated debris from the existing pier and clusters. This includes both underwater and washed-ashore materials. Pilings must be cut at the seabed floor or removed entirely. A post-removal multibeam survey is required to verify removal within the designated area. If additional horizontal pilings are discovered within the designated removal area, their removal is requested. The Period of Performance is 90 days after contract award.

Contract & Timeline

Evaluation & Eligibility

Award will be based on the Lowest Priced, Technically Acceptable offer. To be considered technically acceptable, offerors must submit:

  • Proof of active SAM registration with no exclusions.
  • Prior experience: Minimum of two (2) recent (within 5 years) and relevant contracts/projects similar to the SOW requirements. Government contracts are preferred but not required.
  • A technical proposal detailing how SOW requirements will be carried out.
  • A valid North Carolina Marine or Building contractor's license.
  • Annual Representations and Certifications (Provision 52.204-8) via email with the quote.

Key Clarifications

  • ASCII data from underwater multibeam images has been posted to SAM.gov.
  • For heavy equipment restrictions or laydown area requests, contact Christina Prince Burke, Town Manager of Topsail Beach (910-328-5841, www.topsailbeachnc.gov).
  • The NAICS Code 238910 is confirmed for this project.
  • Proof of disposal at a landfill is not explicitly required; a post-multibeam survey verifies removals.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: Mar 16, 2026
Version 3
Solicitation
Posted: Mar 16, 2026
View
Version 2
Solicitation
Posted: Mar 11, 2026
View
Version 1
Solicitation
Posted: Mar 2, 2026
View
Removal of Topsail Beach Pier | GovScope