Replace Lighting for USCG in Demopolis, AL

SOL #: 70Z02926QNEWO005Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
BASE NEW ORLEANS(00029)
NEW ORLEANS, LA, 70117, United States

Place of Performance

Demopolis, AL

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Lighting Fixtures And Lamps (N062)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 12, 2026
2
Last Updated
Mar 10, 2026
3
Submission Deadline
Mar 4, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard (USCG) is seeking proposals for the replacement of existing lighting with new solar LED streetlights and floodlights at its Shore Side Detachment in Demopolis, AL. This is a 100% Total Small Business Set-Aside opportunity, structured as a Firm-Fixed Price Purchase Order awarded to the Lowest Price Technically Acceptable (LPTA) offer. Quotes are due by March 4, 2026, at 7:00 PM UTC.

Scope of Work

The project involves the removal of 12 existing LED parking lot and pier lights, including unnecessary electrical wiring and components. The contractor will then install 9 new solar LED streetlights and 3 solar LED floodlights, along with all necessary electrical components, mounting equipment, and hardware. Repair of remaining openings on light poles is also required. Specific models like Atlas PFMXW43LED for small sign lights and Atlas SLP16145LEDTF4KU for pole lights are specified. New floodlights must meet or exceed 16,000 lumens, offer 2-5 nights solar autonomy, and withstand 90-110 MPH wind loads. The contractor is responsible for providing all trim, hardware, caulk, and sealing materials, and performing function tests. All electrical runs from the pole base to the top must be removed, with floodlight runs secured and capped.

Performance & Requirements

Work must be completed within 30 calendar days after the Notice to Proceed (NTP). A work schedule and safety plan must be submitted within seven calendar days of contract award. A mandatory site visit is highly recommended prior to submitting a quote to assess existing conditions. Adherence to Federal, State, and local laws, including USACE EM 385-1-1 and FAR 52.236-13 for safety, is required. Department of Labor Wage Rates for Construction in Marengo County, AL, apply. The government acknowledges potential difficulties with the 30-day timeline for submittal review and procurement, suggesting flexibility.

Contract Details & Submission

This is a Combined Synopsis/Solicitation (RFQ). Evaluation factors include Price, Technical Acceptability, and Past Performance. Offerors must be actively registered in SAM.gov. Payment and performance bonds are not required. Quotes should be submitted via email to Joel.S.Ivy@uscg.mil by March 4, 2026, at 7:00 PM UTC. For site visit arrangements, contact MKC Zachary Mason at (251)214-5671 or Zachary.S.Mason@uscg.mil.

People

Points of Contact

MKC Zachary MasonPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: Mar 10, 2026
View
Version 6
Solicitation
Posted: Mar 9, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Mar 6, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Mar 3, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Feb 24, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Feb 18, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Feb 12, 2026
View