Replace Lighting for USCG in Demopolis, AL

SOL #: 70Z02926QNEWO005Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
BASE NEW ORLEANS(00029)
NEW ORLEANS, LA, 70117, United States

Place of Performance

Demopolis, AL

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Lighting Fixtures And Lamps (N062)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 12, 2026
2
Last Updated
Mar 10, 2026
3
Submission Deadline
Mar 11, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard (USCG), under the Department of Homeland Security, is seeking proposals for the replacement of existing lighting with new solar LED systems at its Shore Side Detachment in Demopolis, AL. This opportunity is a 100% Total Small Business Set-Aside. Quotes are due by March 11, 2026.

Scope of Work

The project involves the removal of 12 existing LED parking lot and pier lights, along with associated electrical wiring. The contractor will then install 9 new solar LED streetlights and 3 solar LED floodlights, including all necessary electrical components, mounting equipment, and hardware. Repairs to light pole openings are also required. New solar lights must meet or exceed the performance specifications of the removed lights, such as providing 16,000+ lumens for floodlights, and feature 2-5 nights of solar autonomy with 90-110 MPH wind load resistance. All work must adhere to the provided Scope of Work, which includes specific technical requirements and photos.

Contract Details

  • Type: Firm-Fixed Price Purchase Order (Request for Quotation - RFQ)
  • Set-Aside: 100% Total Small Business
  • Period of Performance: 30 calendar days for completion after Notice to Proceed (NTP). A work schedule and safety plan are due within 7 days of award.
  • Evaluation Factors: Price, Technical Acceptability, and Past Performance. Award will be made to the lowest priced technically acceptable offer.
  • Bonds: Payment and performance bonds are not required.
  • Wage Rates: Department of Labor Wage Rates for Construction in Marengo County, AL, are applicable.

Submission Requirements & Key Dates

  • Quote Submission: Submit quotes to Joel.S.Ivy@uscg.mil.
  • Response Due Date: March 11, 2026, by 6:00 PM ET.
  • Site Visit: A mandatory examination of the Scope of Work is required, and a site visit is highly recommended to assess existing conditions. Contact MKC Zachary Mason at (251)214-5671 or Zachary.S.Mason@uscg.mil to arrange.
  • Eligibility: Offerors must be actively registered in SAM.gov.

Additional Clarifications

The government acknowledges potential difficulties with a 30-day timeline for fixture submittal/procurement and advises bidders to "do what you can." Clarifications confirm that the referenced Atlas fixture specifications are for the lights to be removed, and new solar-powered lighting must meet or exceed their performance. The government is amenable to finding suitable locations for solar panels to ensure adequate sunlight.

People

Points of Contact

MKC Zachary MasonPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: Mar 10, 2026
View
Version 6
Solicitation
Posted: Mar 9, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Mar 6, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Mar 3, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Feb 24, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 18, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 12, 2026
View