Roof Repairs Bldgs HP215, 225, 235, 245, 275, 285, 295

SOL #: N4008526R9017Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 23, 2026
2
Last Updated
Apr 16, 2026
3
Submission Deadline
Apr 16, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVFACSYSCOM MID-ATLANTIC is soliciting proposals for Roof Repairs on seven buildings (HP215, 225, 235, 245, 275, 285, 295) at Marine Corps Base Camp Lejeune, NC. This is a Total Small Business Set-Aside opportunity, restricted to pre-selected MACC contractors. The estimated value is between $5M and $10M. Proposals are due April 16, 2026, by 3:00 PM EST.

Scope of Work

The project involves the removal and disposal of existing shingle roof systems down to the deck, followed by the installation of new aluminum standing seam metal roofing systems with vented ridge caps. This includes replacing damaged decking (up to 5%), installing new aluminum drip edge, self-adhering ice and water membrane, elastomeric expansion joints, and pipe boots. Permanent fall protection systems will also be installed. Contractors must repair and refinish any areas damaged during the work. All new roof systems must be rated for 150 mph winds and comply with North Carolina's Uniform Building Code and UFC criteria.

Contract Details

  • Contract Type: Award based on Lowest Price.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Period of Performance: 360 days after award.
  • Estimated Value: $5,000,000 - $10,000,000.
  • Liquidated Damages: $880 per Calendar Day.
  • Bond Requirements: Payment bond for proposals $35K+, Bid, Payment, and Performance bonds for $150K+.
  • Buy American Act: Applies to construction materials.

Eligibility & Submission

  • Eligibility: Restricted to six specific MACC contractors: Achuti, LLC; Apex Business Solutions, LLC; Quality Roofers and Guttering, Inc.; Riza Construction, Inc.; Seashore Builders, Inc.; and Yerkes South, Inc.
  • Proposal Due Date: April 16, 2026, 3:00 PM EST.
  • Submission Method: Via email to clifton.l.gaither.civ@us.navy.mil and lauren.f.loconto.civ@us.navy.mil.
  • Basis for Award: Lowest Price.
  • Pricing: Bidders must use the Revised Pricing Sheet (Amendment 0004) and submit offers on all line items (ELINs 0001-0009), which include specific building repairs, truss repair, and underlayment/sheathing replacement.
  • Site Visit: A site visit was scheduled for March 9, 2026, at Building HP215.
  • Special Requirements: Contractors must acknowledge all amendments (0001, 0002, 0003, 0004). Work requires coordination with the COR, field verification of conditions, adherence to OSHA and environmental regulations (including asbestos and lead-based paint handling), and minimizing disruption to facility operations.

Contact Information

People

Points of Contact

Lauren LocontoSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Apr 6, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 23, 2026
View