Roof Repairs Bldgs HP225, HP235, HP245, HP275, HP285, & HP295
SOL #: N4008526R9017Combined Synopsis/Solicitation
Overview
Buyer
Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States
Place of Performance
Camp Lejeune, NC
NAICS
Commercial and Institutional Building Construction (236220)
PSC
Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Feb 23, 2026
2
Last Updated
Apr 16, 2026
3
Submission Deadline
Apr 20, 2026, 7:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for Roof Repairs on Buildings HP225, HP235, HP245, HP275, HP285, & HP295 at Marine Corps Base Camp Lejeune, NC. This opportunity is a Total Small Business Set-Aside and is restricted to pre-qualified Roofing MACC Contractors. Proposals are due by April 20, 2026, at 12:00 PM EST.
Scope of Work
The project involves the removal and disposal of existing shingle roof systems and the installation of new aluminum standing seam metal roofing systems, rated for 150 mph winds. Key tasks include:
- Replacement of damaged roof decking (up to 5%).
- Installation of new aluminum drip edge, self-adhering ice and water membrane, and elastomeric expansion joints.
- Installation of pipe boots for existing vent pipes and permanent fall protection systems.
- Repair and refinishing of disturbed areas.
- Handling of potential hazardous materials (asbestos, lead-based paint on fascia) in accordance with regulations. All work must comply with the Uniform Building Code for North Carolina, OSHA standards, and various UFC criteria. The facility will remain operational, requiring minimal interference.
Contract Details
- Solicitation Number: N40085-26-R-9017
- Contract Type: Combined Synopsis/Solicitation, Firm Fixed-Price (award based on Lowest Price).
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Eligibility: Restricted to specific Roofing MACC Contractors.
- Period of Performance: 720 days after award.
- Estimated Cost Range: Between $5,000,000 and $10,000,000.
- Liquidated Damages: $880 per Calendar Day.
Submission Requirements
- Proposal Due Date: April 20, 2026, at 12:00 PM EST.
- Submission Method: Via email to clifton.l.gaither.civ@us.navy.mil and lauren.f.loconto.civ@us.navy.mil.
- Pricing: Offers must be submitted on all six Exhibit Line Item Numbers (ELINs) for buildings HP225, HP235, HP245, HP275, HP285, and HP295 using the latest revised pricing sheet (Amend 0006 Pricing Sheet). Each ELIN price must include all applicable costs, overhead, and profit.
- Amendments: Offerors must acknowledge all amendments, particularly Amendment 0006, which removed Building HP215 from the scope and extended the due date. Failure to acknowledge may result in rejection.
Important Notes
- The Government will evaluate offers by adding the prices for ELINs 0001 through 0006.
- Bond requirements apply: Payment bond for $35K+, and bid, payment, performance bonds for $150K+.
- Contractors must adhere to the Buy American Requirement for construction materials and comply with the Contractor Environmental Guide for Camp Lejeune.
- Funding may not become available, and no award will be made if funds are unavailable.
People
Points of Contact
Clifton GaitherPRIMARY
Lauren LocontoSECONDARY
Files
Versions
Version 8
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
Version 7Viewing
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
Version 6
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Apr 6, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Feb 23, 2026