Roof Repairs Bldgs HP215, HP225, HP235, HP245, HP275, HP285, & HP295

SOL #: N4008526R9017Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 23, 2026
2
Last Updated
Apr 16, 2026
3
Submission Deadline
Apr 16, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVFACSYSCOM MID-ATLANTIC is soliciting proposals for Roof Repairs on seven buildings (HP215, HP225, HP235, HP245, HP275, HP285, & HP295) at Marine Corps Base Camp Lejeune, NC. This is a Total Small Business Set-Aside opportunity, restricted to a specific list of MACC contractors. The project involves replacing existing shingle roofs with new aluminum standing seam metal roofing systems. Proposals are due April 16, 2026, by 3:00 PM EST.

Scope of Work

The project requires the removal and disposal of existing shingle roof systems down to the deck. This includes replacing up to 5% of damaged decking, installing new aluminum drip edge, a self-adhering ice and water membrane, and new aluminum standing seam metal roofs with vented ridge caps. The new systems must be rated for 150 mph winds and utilize 19/32" OSB sheathing. Specific buildings (HP215, HP225, HP235, HP245, HP275, HP285) require 6x6 tubular steel downspouts. The scope also covers installing pipe boots, permanent fall protection, and repairing/refinishing disturbed areas. Contractors must manage hazardous materials, including potential asbestos and lead-based paint on fascia, and minimize interference with facility operations.

Contract & Timeline

  • Type: Combined Synopsis/Solicitation (N40085-26-R-9017)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Estimated Cost: Between $5,000,000 and $10,000,000
  • Period of Performance: 720 days after award
  • Liquidated Damages: $880 per Calendar Day
  • Proposal Due: April 16, 2026, by 3:00 PM EST
  • Published: April 10, 2026

Eligibility & Submission

This opportunity is restricted to a specific list of MACC contractors: Achuti, LLC; Apex Business Solutions, LLC; Quality Roofers and Guttering, Inc.; Riza Construction, Inc.; Seashore Builders, Inc.; and Yerkes South, Inc. Proposals must be submitted via email to clifton.l.gaither.civ@us.navy.mil and lauren.f.loconto.civ@us.navy.mil. Offerors must use the Revised Pricing Sheet (Amend 0004) and submit offers on all line items; failure to do so may result in rejection. All five amendments (0001, 0002, 0003, 0004, 0005) must be acknowledged with the proposal. Award will be based on the Lowest Price.

Additional Notes

Bond requirements apply: payment bonds for proposals $35K+, and bid, payment, and performance bonds for $150K+. The Buy American Act applies to construction materials. Contractors must adhere to the "Contractor Environmental Guide" for MCB Camp Lejeune. A site visit was previously held on March 9, 2026.

People

Points of Contact

Lauren LocontoSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Apr 16, 2026
View
Version 6Viewing
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 6, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 23, 2026
View