61--SJG SOLAR/BPS/POWER CONDITIONING

SOL #: 140G0226R0001Solicitation

Overview

Buyer

Interior
Us Geological Survey
OFC OF ACQUISITION GRANTS-DENVER
DENVER, CO, 80225, United States

Place of Performance

Place of performance not available

NAICS

Solar Electric Power Generation (221114)

PSC

Solar Electric Power Systems (6117)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 5, 2026
2
Last Updated
Mar 9, 2026
3
Submission Deadline
Mar 13, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Geological Survey (USGS), under the Department of Interior, is soliciting proposals for a Solar Photovoltaic Backup Power Generation System with lithium-ion battery storage and power conditioning at the San Juan Magnetic Observatory in Cayey, Puerto Rico. This Total Small Business Set-Aside opportunity aims to ensure continuous data collection by providing reliable backup power to 14 buildings during utility outages. The estimated magnitude of construction is between $100,000 and $250,000. Proposals are due March 13, 2026.

Scope of Work

The contractor will design, construct, and install a zero-export/feed-in metering solar power plus lithium-ion battery storage backup power system (S+B-BPS) at the site's Shop/Garage, including a PV panel array. A power conditioning system will also be installed to manage voltage fluctuations. The S+B-BPS must automatically transfer power within 10 seconds of utility failure and sustain the facility's 14 designated buildings at full normal usage for a minimum of 72 hours, as verified by a 72-hour uninterrupted test. The existing diesel generator will remain as a secondary backup. Key tasks include securing all necessary permits, complying with applicable codes (IBC, NEC, IFC, ASCE), using commercial/industrial grade products with a 20-year service life, protecting the site, and providing training to USGS staff. No ferrous materials are permitted within the designated Exclusion Zone. Contractors must verify site conditions, dimensions, and electrical power consumption (estimated at 5060 kWh/month).

Contract & Timeline

  • Contract Type: Firm-Fixed-Price Solicitation
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 221114 – Power Generation, Solar Electric
  • Period of Performance: April 1, 2026, to July 30, 2026 (120 days)
  • Place of Performance: San Juan Magnetic Observatory, Cayey, PR
  • Proposal Due Date: March 13, 2026, 12:00 PM (Mountain Time)
  • Questions Due Date: March 6, 2026, 12:00 PM (Mountain Time) (This date has passed)
  • Site Visit: A pre-proposal site visit was scheduled for February 19, 2026, at 1:30 PM AST.
  • Bonds: 100% Performance and Payment Bonds are required.

Evaluation

Proposals will be evaluated based on Technical Capabilities, Project Schedule/Plan, Key Personnel Experience, Past Experience, and Price. Technical merit is considered more important than price.

Special Requirements & Notes

Offerors must possess a current contractor license issued by the government of Puerto Rico. The project is subject to prevailing wage rates for Building Construction in Puerto Rico Statewide, as detailed in the provided wage determination (PR20260001). All offers must be valid for 60 days.

Contact: Philip Robinson, philip_robinson@ios.doi.gov

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6Viewing
Solicitation
Posted: Mar 9, 2026
Version 5
Solicitation
Posted: Mar 5, 2026
View
Version 4
Solicitation
Posted: Mar 3, 2026
View
Version 3
Solicitation
Posted: Feb 18, 2026
View
Version 2
Solicitation
Posted: Feb 9, 2026
View
Version 1
Solicitation
Posted: Feb 5, 2026
View
61--SJG SOLAR/BPS/POWER CONDITIONING | GovScope