SOLICITATION: Construction of a new Very High Frequency Omnidirectional Range/Tactical Air Navigation (VORTAC) building in Leeville, LA (LEV)

SOL #: 6973GH-26-R-00088Solicitation

Overview

Buyer

Transportation
Federal Aviation Administration
6973GH FRANCHISE ACQUISITION SVCS
OKLAHOMA CITY, OK, 73125, United States

Place of Performance

Golden Meadow, LA

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Radar And Navigational Facilities (Y1BC)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 15, 2026
2
Last Updated
May 22, 2026
3
Submission Deadline
May 19, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Aviation Administration (FAA) is soliciting proposals for the construction of a new Very High Frequency Omnidirectional Range/Tactical Air Navigation (VORTAC) building in Leeville, LA. This is an unrestricted competitive solicitation for a Firm Fixed Price (FFP) contract, with an estimated value between $8M-$13M. Proposals are due May 19, 2026.

Scope of Work

The project involves constructing a new elevated VORTAC platform (deck at 32' 5") and installing the complete VORTAC system, including a lightning protection system. Key tasks include:

  • Site preparation, surveying, and erosion control.
  • Installation of utilities, conduit systems, and fiber optic cabling.
  • Construction of foundations, structural steel framing, and an equipment shelter.
  • Installation of mechanical/electrical systems, propane fuel tank, engine generator, and battery rack.
  • Installation of VOR monitor antennas, VOR antenna teepee, TACAN antenna, and fiberglass lattice mast.
  • Implementation of a Quality Control Plan and required testing.
  • Staging work to minimize outage time and coordinating all shutdowns/cutovers with FAA Air Traffic Management (30-day notice required).
  • Compliance with work hour restrictions (Mon-Fri, 7:00 AM–5:30 PM) and daily coordination with the FAA COR.
  • Addressing remote site conditions and hurricane-impacted terrain.

Contract Details

  • Contract Type: Firm Fixed Price (FFP)
  • Estimated Value: $8M-$13M
  • Set-Aside: Unrestricted Competition
  • Period of Performance: Work must start within 15 days after Notice to Proceed and be completed by December 31, 2027.
  • Requirements: A 20% proposal guarantee, Performance and Payment Bonds, and SAM registration are mandatory.

Submission Requirements & Evaluation

Offerors must submit a comprehensive proposal including:

  • Completed SIR document.
  • Technical Approach Plan.
  • Completed Organizational Experience Questionnaire (OEQ).
  • Key Personnel List.
  • Safety and Security Plan.
  • Fully Executed SF-24 Bid Bond. Proposals will be evaluated based on Lowest Price Technically Acceptable (LPTA) criteria, requiring offerors to be responsive, responsible, and technically acceptable.

Key Dates & Actions

  • Site Visit: May 5, 2026, at 10:00 AM local time in Leeville, LA. RSVP to Kenneth Daily (Kenneth.Daily@faa.gov, 817-600-4897) by May 4, 2026. Real ID is required. This visit is for site viewing only.
  • Questions Due: May 9, 2026 (10 days prior to closing date) via email to Stephen.N.Branch@faa.gov with "Questions 6973GH-26-R-00088 LEV VORTAC" in the subject line.
  • Proposals Due: May 19, 2026, by 4:00 PM Central Time, via email to Stephen.n.branch@faa.gov. Subject line: "SIR Response: 6973GH-26-R-00088 LEV VORTAC". Extensions are unlikely.
  • Wage Determination: Bidders must review General Decision Number LA20260040 for prevailing wage rates in Lafourche County, LA.

People

Points of Contact

Stephen BranchPRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 6
Solicitation
Posted: May 22, 2026
View
Version 5
Solicitation
Posted: May 14, 2026
View
Version 4
Solicitation
Posted: Apr 27, 2026
View
Version 3
Solicitation
Posted: Apr 23, 2026
View
Version 2Viewing
Solicitation
Posted: Apr 20, 2026
Version 1
Solicitation
Posted: Apr 15, 2026
View